Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel BAM Groep Koninklijke AEX:BAMNB.NL, NL0000337319

  • 3,516 13 mei 2024 11:18
  • +0,024 (+0,69%) Dagrange 3,478 - 3,516
  • 289.022 Gem. (3M) 1,6M

BAM maart 2022

803 Posts
Pagina: «« 1 ... 13 14 15 16 17 ... 41 »» | Laatste | Omlaag ↓
  1. JVDP 11 maart 2022 14:28
    REUTERS: "There are certain positive shifts, negotiators on our side tell me," Putin said in a meeting with his Belarusian counterpart Alexander Lukashenko, adding that talks continued "practically on a daily basis".

    Geplukt van het ING forum, dat was de oorzaak van die spike tussen de middag.
  2. forum rang 6 €d_Modus Vivendi 12 maart 2022 20:31
    DWS Investment GmbH - Koninklijke BAM Groep N.V. - Bunnik
    Below you will find information from the register substantial holdings and gross short positions. The information has been provided by the organisation.

    Date of transaction08 mar 2022Person obliged to notifyDWS Investment GmbHIssuing institutionKoninklijke BAM Groep N.V.Registration Chamber of Commerce30058019Place of residenceBunnik
    Previous result
    Next result
    Distribution in numbers
    Type of share Number of shares Number of voting rights Capital interest Voting rights Manner of disposal Settlement
    Gewoon aandeel 5.413.563,00 5.933.747,00 Reëel Reëel Middellijk
    (DWS Investment GmbH)
    Distribution in percentages
    Type Total holding Directly real Directly potential Indirectly real Indirectly potential
    Kapitaalbelang 1,94 % 0,00 % 0,00 % 1,94 % 0,00 %
    Stemrecht 2,12 % 0,00 % 0,00 % 2,12 % 0,00 %
    Date last update: 12 March 2022
  3. forum rang 7 innicksname 14 maart 2022 09:19
    quote:

    popie schreef op 13 maart 2022 18:28:

    Er zijn serieuze onderhandelingen tussen O en R laten we hopen dat het wat oplevert ,
    Absoluut, hoop het ook. Maar twijfel wel over de bron. In geval van Rusland eerst zien en dan geloven. Zag gisteren beeld van de ambassadeur en die gelooft blijkbaar nog in sprookjes.
  4. forum rang 7 innicksname 14 maart 2022 09:20
    quote:

    €d_Modus Vivendi schreef op 14 maart 2022 07:22:

    [...]ja, dat Poetin aftreedt. ;]
    Dat zie ik niet gebeuren, despoten zijn slecht in zelfreflectie (ze laten het althans niet zien). Maar misschien offeren sommige mensen zich op om de man een shotje/toefje zenuwgas te geven.
  5. forum rang 8 HenkdeV 14 maart 2022 09:38
    quote:

    innicksname schreef op 14 maart 2022 09:20:

    [...]
    Dat zie ik niet gebeuren, despoten zijn slecht in zelfreflectie (ze laten het althans niet zien). Maar misschien offeren sommige mensen zich op om de man een shotje/toefje zenuwgas te geven.
    Toch loopt het op de langere termijn vaak slecht af met dit soort figuren.

  6. forum rang 7 innicksname 14 maart 2022 10:20
    quote:

    HenkdeV schreef op 14 maart 2022 09:38:

    [...]

    Toch loopt het op de langere termijn vaak slecht af met dit soort figuren.

    Ja, uiteindelijk vallen ze wel om. Oekraïne zou nu best kunnen toezeggen niet actief met de EU dan wel de NAVO zaken te willen doen, vervolgens 10 jaar wachten en alsnog aansluiten (mits het onder de gestelde voorwaarden kan). Tegen die tijd is Poetin 80 en Rusland al 3x failliet gegaan. Misschien wil Rusland tegen die tijd wel bij Oekraïne horen of zelfs de EU :-)
  7. forum rang 6 €d_Modus Vivendi 14 maart 2022 12:42
    Tier ones get to work on Lower Thames Crossing bids

    14 Mar 2022 By Rob Horgan

    Tier one contractors shortlisted for the Lower Thames Crossing roads packages have been told to start working on their bids.

    National Highways has today formally begun the invitation to tender phase of procurement for its £1.9bn Lower Thames Crossing roads contractors.

    The £1.9bn investment covers two contracts, one for roads north of the Thames in Essex and a second for roads south of the river in Kent. A third contract to build the tunnels themselves and the approach roads, worth £2.1bn, will be tendered in the coming weeks.

    Five shortlisted bidders were announced across the two contracts last year in response to National Highways initial call for interest.

    The £1.3bn Roads North of the Thames contract includes 16km of new road, more than 30 structures including four green bridges and viaducts, and junctions with the A13 and M25, 40km of paths and new parks and woodlands. Balfour Beatty and a JV between Kier and Eiffage will compete for the contract.

    Meanwhile, the £600m Kent Roads package includes 6km of new road, a junction with the A2, three green bridges, 20km of pathways and a new park near Gravesend. The shortlisted bidders include a JV between Bam Nuttall, Ferrovial and Vinci; Costain; a JV between Kier and Eiffage; and Skanska.

    Contractors will be judged on their ability to strip carbon emissions out of the construction process, after the project was designated a pathfinder project to explore carbon neutral construction in the UK.

    Contracts are due to be awarded in summer 2023, with construction planned for the following year.

    The proposed Lower Thames Crossing includes the longest road tunnel in the UK and 23km of new road that would almost double road capacity across the River Thames east of London.

    Shortlisted bidders have been invited to work up their bids, despite delays to the project’s development consent order (DCO) application.

    National Highways – then Highways England – was forced to pull its original plans following feedback from the Planning Inspectorate in November 2020. It was then due to go in before the end of last year, but was held up after the government announced an expansion at the Port of Tilbury which uses land original earmarked by National Highways for spoil.

    National Highways now expects to resubmit its DCO application later this year, after holding a short consultation on construction changes enforced by the Port of Tilbury scheme.

    Lower Thames Crossing programme procurement director Katharine Ferguson said: “Our roads are at the heart of our way of life, and will continue to be long into our low-carbon future.

    “The Lower Thames Crossing will improve journeys for millions of people, create opportunities for local people and businesses, as well as help the country on the road to net zero. We know the construction industry shares our ambitions, and I am incredibly excited to see how we can work together to set a new bar for low-carbon construction and maximise the benefits to the local community.”
    The bidders are:

    Kent Roads (lot one) – £600m:

    BFV JV; comprising of Bam Nuttall, Ferrovial Construction (UK) and Vinci Construction Grands Projets;
    Costain;
    Kier Eiffage JV; comprising of Kier Highways Limited and Eiffage Génie Civil;
    Skanska Construction UK.

    Roads North of the Thames (lot two) – £1.3bn:

    Balfour Beatty Civil Engineering;
    Kier Eiffage JV; comprising of Kier Highways Limited and Eiffage Génie Civil.

  8. forum rang 6 €d_Modus Vivendi 14 maart 2022 15:12
    Onderhandelingen Oekraïne en Rusland uitgesteld tot morgen
    Volgens een adviseur van de Oekraïense president Volodimir Zelenski, Michailo Podoljak, zijn de onderhandelingen tussen Rusland en Oekraïne uitgesteld naar morgen. Hij noemt het een 'technische pauze', schrijft hij op Twitter.
803 Posts
Pagina: «« 1 ... 13 14 15 16 17 ... 41 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

Tegenvallers drukken resultaten BAM

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links