Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Australian Mines AUZ

75 Posts
Pagina: «« 1 2 3 4 »» | Laatste | Omlaag ↓
  1. Petex 29 mei 2018 08:55
    29 May 2018



    Large-scale cobalt-in-soil anomalies identified at Thackaringa Project;

    Sconi continues to advance towards development milestones


    HIGHLIGHTS

    • Three zones of anomalous cobalt-in-soils identified in Target Area A at Thackaringa Project

    • Amplitude of cobalt-in-soil anomalies similar to the surface expression of the region’s known cobalt deposits

    • Geochemical sampling program over Target Area B and Target Area C at Thackaringa Project continuing

    • Optimisation of demonstration-size plant’s flow chart has reduced full circuit running times from 65 hours to 50 hours, in addition to delivering improved cobalt, nickel and scandium recoveries

    o Australian Mines’ processing plant converting Sconi ore to cobalt sulphate and nickel sulphate products in just over 2 days

    • Project finance negotiations continue to accelerate as international banking and financial institutions position to fund Sconi Project

  2. forum rang 10 DeZwarteRidder 30 mei 2018 09:08
    quote:

    Petex schreef op 30 mei 2018 08:35:

    Onderstaande link en dan kiezen voor de nieuwste EGM presentatie van 30 mei 2018.... Zeer interessant leesvoer over dit bedrijf, wat ook zomaar eens een pareltje kan blijken in deze sector!
    australianmines.com.au/asx-announcement
    Het klinkt allemaal heel mooi, maar helaas duurt het nog ca 4 à 5 jaar voordat er echt geproduceerd kan worden.

    Ik vrees dat tegen die tijd alles weer veranderd is.

    Metaal winnen uit laterite is bovendien vaak grote ellende.
  3. ruud71 20 juni 2018 11:02
    quote:

    DeZwarteRidder schreef op 30 mei 2018 09:08:

    [...]
    Het klinkt allemaal heel mooi, maar helaas duurt het nog ca 4 à 5 jaar voordat er echt geproduceerd kan worden.

    Ik vrees dat tegen die tijd alles weer veranderd is.

    Metaal winnen uit laterite is bovendien vaak grote ellende.
    Klinkt zeker allemaal mooi! Luister naar de presentatie van vorige week in Londen.

    hotcopper.com.au/threads/london-prese...
    Voor 6 jaar een overeenkomst met SKI voor afnama van 60.000 ton Nickel en 12.000 Ton Cobalt en met een optie van nog 7 jaar. Tegen de huidige prijzen zou dit een opbrengst, met aftrek van hun kosten zijn, van 240 miljoen australische dollars per jaar.
    Dit betreft dan alleen hun Sconi project waar ook nog scandium gewonnen gaat worden. Hebben we het nog niet over hun andere 2 gigantische projecten.

    En het mooie wat er in de presentatie wordt gemeld, is dat de fabriek voor de verwerking van de metalen door SKi wordt geregeld!

    Australian Mines is een monster in wording.
  4. ruud71 20 juni 2018 11:25
    quote:

    DeZwarteRidder schreef op 20 juni 2018 11:10:

    Zelfs bij CleanTeq duurt het nog vele jaren tot productie, dus bij AUZ zal het nog veel langer duren.

    Dit soort 'juichmomenten' zijn achteraf vaak de beste verkoopmomenten.
    Vaak, maar hoogstwaarschijnlijk in dit geval niet. Men gaat dit jaar al starten met de bouw van de fabriek.
    In de link een opsomming van verschillen tussen AUZ en CleanTeq

    hotcopper.com.au/threads/possible-bfs...
  5. Petex 20 juni 2018 11:29
    Sconi Definitive Feasibility Study: End Q2 2018
    Deze of volgende week dus... kan een boost geven aan de koers.

    SK Innovation holds option to purchase up to 19.9% of Australian Mines for $0.12 per share
    zal binnen 3 maanden na BFS volgen, dus wederom een trigger.

    Financieel zal wellicht SKI een flinke duit in het zakje doen, tegen gunstige voorwaarden. Hier is op de laatste meeting wellicht wat teveel uit de mond gevallen zonder officiele PR, waardoor wellicht het aandeel momenteel door de ASX van de beurs gehaald is sinds gisteren in afwachting van vragen door ASX aan AUZ.

    Ik zit zelf behoorlijk fors in AUZ momenteel.....
  6. Petex 22 juni 2018 10:08
    Australian Mines Limited (“Australian Mines” or “the Company”) (Australia ASX: AUZ; USA OTCQB: AMSLF; Frankfurt Stock Exchange: MJH) advises that a review of the sterilisation drilling1 completed across the proposed processing infrastructure sites at Sconi, as part of the Company’s Bankable Feasibility Study (BFS), has indicated that high grade cobalt and nickel mineralisation2 extends across the sites proposed for the processing plant and haul roads.

    The sterilisation drilling, undertaken by Metallica Minerals Limited in the lead-up to the project’s Pre-Feasibility Study3 (PFS), identified a preferred site for the processing plant at Sconi. This location appears primarily designed to optimise scandium production from the ore body and did not comprehensively sterilise the cobalt and nickel prospectivity of the proposed mining and processing area.

    Since acquiring a 100%-interest in the Sconi Project from Metallica Minerals in 2017, and having signed a binding off-take agreement with SK Innovation1, Australian Mines has been focused on optimising the Sconi BFS for cobalt and nickel production to maximise economic returns from the Project4.
    This finding by Australian Mines’ Studies Team that the previous sterilisation drilling intersected similar grades to those included in the project’s current Mineral Resource5 indicates that the overall footprint of cobalt and nickel mineralisation at the Company’s 100%owned Sconi Project may be significantly larger than previously indicated by both the PreFeasibility Study6 (PFS) for Sconi and the project’s existing Mineral Resource Statement.

    As a result, Australian Mines, in collaboration with lead engineering firm Ausenco7, are presently re-evaluating the location and layout of the full-scale cobalt-nickel-scandium processing plant, and associated non-processing infrastructure to ensure the final site design enables maximum operational efficiency (and, thus, the lowest possible operating costs for the project) in tandem with optimising the Sconi Project’s Life-of-Mine.

    The current optimisation process for the Sconi BFS, which is appropriate in light of the additional cobalt and nickel mineralisation within sites earmarked for the processing plant and supporting infrastructure8, will necessarily result in a slight adjustment to the proposed BFS timetable. The Company now expects to receive the draft version of the report by the end of July 2018, with the final Board-approved version subsequently released to the market in September 2018.

    This adjusted timing of the BFS is not expected to have any effect on the construction date for the project given that both SK and the financial institutions engaged in negotiations with Australian Mines are imbedded in the Company’s current BFS process.


    Australian Mines’ Managing Director, Benjamin Bell, commented: “Australian Mines remains committed to delivering the maximum value to shareholders from the Sconi Project through the delivery of a large-scale cobalt-nickel-scandium mining and processing operation in northern Queensland.

    “Given this operation has the potential to run for several decades once commissioned it is imperative that we invest time at this critical planning stage to ensure the site is set-up to maximise and sustain future production.

    “The positive news for Australian Mines’ shareholders from the review of the sterilisation drilling program, is that the grades intersected were sufficient for us to reassess the plant location and will inevitably be the catalyst for us to reassess the overall footprint of the cobalt and nickel mineralisation.

    “The results from sterilisation drilling at Sconi, along with the anticipated results from the upcoming resource expansion drill program will provide significant data for us to revisit the existing Mineral Resource estimate and assess potential future conversion of those resources to Ore Reserves.”
  7. Petex 22 juni 2018 10:11
    Schorsing ASX is nog steeds gaande, hierover helaas nog geen nieuws.....
    BFS dus uiterlijk september ipv deze weken.... reden behoeft denk ik geen uitleg en ziet er naar uit, dat er nog meer grondstof te halen valt dan men eerst veronderstelde. Start bouw en overige planning schijnt hierdoor niet in gevaar te komen.
    Indien AUZ weer in de handel zit, probeer ik op deze koersen zeker nog wat bij te kopen voor LT.
  8. Petex 22 juni 2018 12:44
    quote:

    DeZwarteRidder schreef op 22 juni 2018 12:33:

    [...]
    Het duurt 5 tot 10 jaar voordat die mijn gaat produceren.
    dan denk ik dat u zich iets beter in moet lezen in dit aandeel.... zeker nog lange termijn politiek, echter zal SKI nooit akkoord gaan met pas productie over 5 tot 10 jaar..... Start bouw en financieringen nog dit jaar en voor die tijd nog zeker meer mijlpalen te behalen met gunstige invloed op de koers.

    Zie ook presentatie voor de tijdslijnen.

    Fijn weekend alvast!
  9. forum rang 10 DeZwarteRidder 22 juni 2018 12:52
    quote:

    Petex schreef op 22 juni 2018 12:44:

    [...]dan denk ik dat u zich iets beter in moet lezen in dit aandeel.... zeker nog lange termijn politiek, echter zal SKI nooit akkoord gaan met pas productie over 5 tot 10 jaar..... Start bouw en financieringen nog dit jaar en voor die tijd nog zeker meer mijlpalen te behalen met gunstige invloed op de koers.
    Zie ook presentatie voor de tijdslijnen.
    Fijn weekend alvast!
    Die overeenkomst met SKI is een wassen neus; in de mijnbouw krijg je 2 garanties: het duurt veel langer en het kost veel meer.

    De leveranciers van dit soort mijnbouwspullen hebben een levertijd van vele jaren.
  10. Petex 22 juni 2018 13:00
    quote:

    DeZwarteRidder schreef op 22 juni 2018 12:52:

    [...]
    Die overeenkomst met SKI is een wassen neus; in de mijnbouw krijg je 2 garanties: het duurt veel langer en het kost veel meer.

    De leveranciers van dit soort mijnbouwspullen hebben een levertijd van vele jaren.
    geheel mee eens.

    Grote verschil is echter dat SKI een kapitaalkrachtige wereldspeler is en met kapitaal kan je zeker zaken die geregeld moeten worden laten versnellen.....
  11. Petex 27 juni 2018 13:24
    Resource expansion drill program commenced at Sconi Project


    HIGHLIGHTS

    • 50,000 metre Mineral Resource expansion drilling program commenced at Sconi Cobalt-Nickel-Scandium Project in northern Queensland

    • Targeting additional tonnage and high-grade cobalt & nickel zones along strike of the existing Mineral Resource • Regional-scale prospective geology within Australian Mines’ tenements remains available for potential conversion into additional resources



    Australian Mines Limited (“Australian Mines” or “the Company”) (Australia ASX: AUZ; USA OTCQB: AMSLF; Frankfurt Stock Exchange: MJH) is pleased to announce it has commenced a 50,000-metre Reverse Circulation (RC) drill program at the Sconi Cobalt-Nickel-Scandium Project in northern Queensland.

    The close-spaced RC program has been designed to lift the overall tonnage of the Project’s existing Mineral Resource1, and to confirm high-grade zones of cobalt and nickel mineralisation identified within the overall deposit, which would allow Australian Mines to further optimise its proposed production from Sconi to capitalise on buoyant commodity price trends.

    The detailed planning for this program has been completed in the context of the Bankable Feasibility Study optimisation process and will further explore the potential of the regionalscale areas of prospective geology beyond the existing Resource footprint at the Project.

    The exploration modelling completed to date by the Company’s technical team indicates that less than half of the prospective cobalt and nickel-bearing geology at Sconi has been drill tested at a spacing that allows it to be incorporated in current Mineral Resource2 estimates.


    Australian Mines Managing Director Benjamin Bell commented: “This drill program represents a significant investment by Australian Mines in building the tonnage and understanding of the resources at Sconi, and will enable us to maximise the economic return from the Project.

    “The existing global Mineral Resource for Sconi is contained within three deposits and the planned drilling is focused on extending the mineralisation at each of these in a manner that is expected to immediately add to the project’s Measured and Indicated Resources in a form that can be readily converted to an Ore Reserve in the future for the mining operation.

    “We have also recently added to our large land holding at Sconi through a new tenement covering 272 square kilometres, which is considered prospective for mineralisation in its own right. This sees Australian Mines’ total landholding at Sconi approaching 2,000 square kilometres.”
  12. Petex 27 juni 2018 13:27
    e.e.a. wordt steeds massaler....
    Overigens vannacht weer start handel in Australië.
    Vragen ASX zijn door AUZ beantwoord.
    CEO heeft teveel uit zijn mond laten vallen tijdens de meeting in Londen, tegen de regels ASX.
    Mag niet natuurlijk, maar geeft wel aan hoe enthousiast (en misschien gehaaid...) Benjamin Bell is.
    BFS uiterlijk 30 september.
75 Posts
Pagina: «« 1 2 3 4 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Indices

AEX 887,44 +0,99%
EUR/USD 1,0762 +0,34%
FTSE 100 8.213,49 +0,51%
Germany40^ 18.017,10 +0,09%
Gold spot 2.301,75 0,00%
NY-Nasdaq Composite 16.156,33 +1,99%

Stijgers

VIVORY...
+7,18%
Flow T...
+4,87%
BESI
+4,11%
Brunel
+3,91%
UMG
+3,62%

Dalers

HEIJMA...
-5,17%
Aperam
-4,56%
AMG Cr...
-3,16%
Kendrion
-2,75%
CM.COM
-2,24%

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links