Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel BAM Groep Koninklijke AEX:BAMNB.NL, NL0000337319

  • 3,850 31 mei 2024 17:35
  • +0,006 (+0,16%) Dagrange 3,824 - 3,856
  • 1.290.886 Gem. (3M) 1,2M

BAM februari 2017

2.159 Posts
Pagina: «« 1 ... 91 92 93 94 95 ... 108 »» | Laatste | Omlaag ↓
  1. JVDP 21 februari 2017 21:41
    quote:

    €d_Modus Vivendi schreef op 21 februari 2017 20:53:

    je mag hier NIET mopperen jvdp anders krijg je em van HdV ;)
    Nukkige Groningers kan ik met woorden wel de baas, geen probleem €d!

    En mopperen is geen sprake van, gewoon een constatering dat ramptoeristen van alle tijden zijn.

    Gr JvdPee
  2. Gerard_ecb 21 februari 2017 22:00
    quote:

    W schreef op 21 februari 2017 17:43:

    [...]

    jawel hoor

    KBC : koop advies , koersdoel 5,50
    lange termijn goede herstelkandidaat

    ABN : koop advies, echter voor dit jaar eerder een 5 euro aandeel, verder zelfde view als KBC lange termijn , goede herstel kandidaat

    Kepler Cheuvreux " not good enough " koersdoel 4,25 - dat niveau zien ze dan wel als een koop opportuniteit.

    alle koersdoelen zijn basis 12 maand, voor de iets langere termijn krijg je een ander plaatje

    samenvattend ( deze rapporten zij nu eenmaal in t Engels)

    " strong performing division in the quarter were Civil Engineering and PPP, while Property and Construction and M&E services lagged consensus estimates

    2H16 net income ( no quarterly data available) came in at eur 13.9 mio versus consensus expectation of eur 28mio

    the backlog of older projects was eur 0,3 bn YE16
    the costs of these projects hv been de-risked and in the process of being settled

    BAM had a total of 51mio non-cash impairment, of which eur 44mio relates to Dutch property
    "

    estimate 2017 / estimate 2018

    sales (mio): 7.478,5 / 7.5271,1
    EBITDA adj: 243 /249
    EBIT adj: 164 /170
    net profit adj: 160.1 /170
    FCF : 164 / 171.9
    EPS adj : 0,59 / 0,63
    net dividend: 0,25 / 0,25

    p/e adj: 8,4 / 7,9
    EV/EBITDA: 5,4 / 4,9
    EV/EBIT: 8 / 7,2
    FCF yield: 12,1% / 12,7%
    dividend yield: 5% / 5%

    model op basis van verwachtingen target price 6/7 euro 24 maand
    ( met de nodige if's and but's , niet enkel interne factoren, ook externe factoren spelen een rol en hebben weging, maw algeheel sentiment beurzen, ontwikkeling sector, valuta's enz..)
    Thanks Wies voor het delen van deze rapporten.

    Dus de consensus is

    Eps 2017 0,59 en 2018 0,63

    Nou dan zal het bij Q1 moeten blijken. Mochten ze dan de putlook meer kleur geven en mocht dan blijken dat ze inderdaad richting dit niveau gaan. Dan is het geen 5€ maar 6€ en dan heb je nog slechts 10 k/w.

    Ik heb de cc gevolgd en er is veel gevraagd om meer kleur te geven aan de outlook maar Rob wilde er niet aan meewerken, bang om weer met een teleurstelling te komen. Wellicht dat ze ten tijde van Q1 meer zicht hebben (is dan mei) zodat we tegen die tijd de 6€ op kunnen gaan zoeken. Als ze nu al een duidelijke outlok hadden afgegeven dan was de koers echt wel dik over de 5 gebleven. Nu moeten we het even hiermee doen.

    Succes

  3. Fred107 21 februari 2017 22:31
    quote:

    €d_Modus Vivendi schreef op 21 februari 2017 22:24:

    [...]gewoon een beetje bashen, lekker puh, sliep uit etc.
    ik zie dat nut niet zo,dat bashen, snap ook wel dat het dat is.
    Wil het liever informatief zien hier. Daar heb je wat aan.

    Wat betreft het hospitaal in Ierland, moeten ze er daar nou weer allemaal plasjes overheen doen alvorens te kunnen beginnen? Het is volgens mij duidelijk dat BAM de opdracht toegewezen heeft gekregen.
  4. forum rang 6 €d_Modus Vivendi 21 februari 2017 22:42
    quote:

    Fred107 schreef op 21 februari 2017 22:31:

    [...] ik zie dat nut niet zo,dat bashen, snap ook wel dat het dat is.
    Wil het liever informatief zien hier. Daar heb je wat aan.

    Wat betreft het hospitaal in Ierland, moeten ze er daar nou weer allemaal plasjes overheen doen alvorens te kunnen beginnen? Het is volgens mij duidelijk dat BAM de opdracht toegewezen heeft gekregen.
    Ik snap er de rozen niet meer van. De politiek zeurt over de prijs en de bevolking wil het ziekenhuis naar de rand van de stad aan de snelweg.
    Intussen is BAM wel al in augustus begonnen aan fase 1 van de bouw. Hier is door BAM nooit een melding van gemaakt, noch op hun ierse site. Het gehele project moet oddicieel nog worden toegekend terwijl de cooling periode al voorbij is.

    BAM Contractors have been awarded the contract for the first phase of works at the New Children’s Hospital.

    Minister for Health, Simon Harris along with the CEOs of the three children’s hospitals, the CEO of St. James’s Hospital, Master of the Coombe Women and Infants University Hospital, the CEO of the Children’s Hospital Group and the Project Director for the National Paediatric Hospital Development Board were on the site of the new children’s hospital to mark the commencement of the first phase of construction.

    Construction equipment has arrived on site and will be put to use in the coming weeks as works get underway on this much needed and much wanted project. The new children’s hospital is being built on the 50 acre campus shared with St. James’s Hospital. The location of the hospital was selected in 2012 following a comprehensive process which involved local and international experts. As is best practice internationally, the new children’s hospital will be tri-located with an adult teaching hospital and in due course, with the Coombe Women and Infants University Hospital.



    Speaking at the photocall to mark this special day, Minister for Health, Simon Harris said: “The delivery of the new children’s hospital is a landmark capital project for this Government and for the country. I am delighted to be here for the commencement of the first phase of construction, a major step towards transforming how paediatric care is delivered in this country. Bringing together the three children’s hospitals under one roof will mean that the sickest children will no longer have to move from hospital to hospital to avail of the care they need. It will also lead to better clinical outcomes for children as there will be greater opportunities for staff to work together across disciplines. Children and young people receiving complex treatment and care, young people transitioning to adult services, as well as the sickest new-borns and mothers, will greatly benefit from specialist services coming together on this campus. The start of the first phase of construction today means we are taking a key step in making the vision of this world class facility a reality.”

    Theo Cullinane, CEO, BAM Contractors said: “We are delighted to work with the NPHDB and the Children’s Hospital Group on the first phase of construction of this flagship national project. We understand the importance of this development and the impact that it will have on children, young people and families once complete. It is a privilege to have the opportunity to play our part in delivering this project for the people of Ireland.”

    Speaking about today’s developments, Project Director, NPHDB, John Pollock said: “Working with the world class design team, extensive time and effort has gone into designing what will be one of the finest children’s hospitals in the world. Extensive engagement and consultation with families, staff and the local community has helped to inform this design, bringing us closer to the delivery of what will be a fantastic modern facility for children and young people. We are very proud of what has been achieved in the design and I am delighted that, following the recent receipt of planning permission, we are now moving to the construction phase of the project which is another major milestone. I would like to congratulate BAM Contractors who have been appointed to undertake the first phase of construction. We look forward to working with them in the weeks and months ahead on this eagerly awaited project.”

    Click here to book tickets for the
    Irish BIM Innovation Awards 2016

    Click here to book tickets for the
    Irish BIM Innovation Awards 2016



    Eilísh Hardiman, Chief Executive of the Children’s Hospital Group said: “The new children’s hospital, with its world class design, will be at the centre of a new clinical network for paediatric services in Ireland that support keeping appropriate paediatric services local. The new hospital, tri-located with an adult hospital and in time with a maternity hospital, will provide the sickest children in the country with access to a full range of medical, surgical and diagnostic specialities. This will improve survivorship, clinical outcomes and provide greater opportunities to partner in areas of clinical research and innovation. Today marks a special day as we see the physical works commence and we look forward to work on the new Urgent Care Centres at Tallaght and Blanchardstown beginning later this year.”

    www.irishbuildingmagazine.ie/2016/08/...
2.159 Posts
Pagina: «« 1 ... 91 92 93 94 95 ... 108 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

Tegenvallers drukken resultaten BAM

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links