Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel Accsys Technologies AEX:AXS.NL, GB00BQQFX454

  • 0,658 30 apr 2024 10:18
  • +0,013 (+2,02%) Dagrange 0,650 - 0,659
  • 18.971 Gem. (3M) 153,3K

Accsys Technologis 2024

588 Posts
Pagina: «« 1 ... 25 26 27 28 29 30 »» | Laatste | Omlaag ↓
  1. Bert van M 10 april 2024 07:57
    quote:

    pietje-2005 schreef op 9 april 2024 09:55:

    [...]
    Wie is dat hier, dat "Nederland" ?
    Is dit echt zo?
    "volledig" wil zeggen dat er al een deel in hout wordt gebouwd ?
    Lijkt me sowieso niet verstandig alles van hout te maken, gesteld dat dat technisch en sterktekundig mogelijk is ?
    Maar, een berg meer omzet is altijd welkom, natuurlijk.
    Beleggers en grote investeerders is dit nog ontgaan ? ;-)
    Succes
    Technisch zijn er niet zoveel beperkingen in het bouwen met hout, er is al behoorlijk wat hoogbouw gedaan volledig uit hout.
    In Oslo staat een volledig uit hout opgetrokken gebouw van 85 meter hoog.
    Ook in Nederland staan volledig houten hoogbouw wooncomplexen, zoals Stories in Amsterdam.
    Over een tekort aan hout hoeft men zich geen zorgen te maken, bij duurzame bosbouw is de jaarlijkse aanwas groter dan benodigd voor het bouwen. Moet Houtbouw leg je CO2 vast voor decennia, dus bouwen in/met hout is zeer duurzaam, veel duurzamer dan de complete kaalslag die wordt veroorzaakt door bv. de rampzalige "duurzame" (want circulair)verbranding in een biomassacentrale.
  2. forum rang 6 pietje-2005 10 april 2024 10:39
    @Bert van M: Qua technisch / sterkte vroeg ik me meer af of het qua oppervlakte dezelfde ruimte biedt.
    Als je bijvoorbeeld een betonnen appartamentencomplex ergens tussenuit haalt, en een houten wegzet, of dan bij dezelfde gebruikte buitenruimte hetzelfde aan binnenruimte geboden wordt.
    Natuurlijk kun je ongelimiteerd de hoogte in, maar wat vereist dat aan (meer?) bodemoppervlak, en wat biedt het aan binnenruimte aan procenten van buitenruimte, bij wijze van spreken.
    Maar, laten ze de hele wereld maar omgooien naar houtbouw :-)
    Succes
  3. forum rang 6 Triple A 15 april 2024 08:58
    Een bericht dat ik eerder deze week op een andere website vond heeft Accsys nu ook op de eigen website geplaatst.

    BLACK project selected for Low Carbon Building Initiative
    www.accsysplc.com/black-project-selec...

    The BLACK urban renewal project in the Parisian suburb of Clichy-La-Garenne has been selected by the Low Carbon Building Initiative (LCBI) as one of its fifteen pioneering projects across Europe.

    The LCBI, is a non-profit organisation aiming to reduce carbon emissions in the real estate industry.

    LCBI unites major European real estate stakeholders to promote low carbon buildings in Europe and has created the first pan-European low carbon label measuring the carbon footprint of real estate based on a Life-Cycle Analysis.

    The BLACK project in Clichy is the largest low-carbon building in France. It is a unique development that has been designed with sustainability at its core. Situated right beside Parc des Impressionnistes, the project’s ethical design blends nature’s elements with unique architecture to create a space that sits in harmony with its surroundings.

    The distinctive timber cladding has undergone the Japanese charring technique of Shou Sugi Ban. This ancient art involves burning the wood to leave a decorative and protective layer of charcoal on its surface which shields the wood underneath from rot.

    By opting for a façade using Accoya timber that has been treated using this process, the architect saved 1,000 tonnes of CO2 without compromising on performance.

    The carbon savings resulted from the fact that the initial design had recommended the use of aluminium. The decision to replace this with charred Accoya wood was one of a number of material decisions made to enhance the building’s environmental performance and credentials.

    The Accoya wood itself is made from 100% FSC® (CO12330) certified sustainable wood sources, is 100% renewable, long lasting, non-toxic and renowned for its circular economy properties. It was recently re-awarded Cradle to Cradle® Gold certification and achieved Platinum for Material Health.

    The use of low-carbon materials, such as Accoya timber, resulted in an overall saving of 3,000 tonnes of carbon.

    Emmanuel Combarel, director at Emmanuel Combarel Dominique Marrec architectes (ECDM), said: “The project takes place in a location where the city is transforming. […] The building is black and understated; it speaks of material and work on the material, of wood and protective carbon. It is black, without color, it addresses the daylight or nighttime to reveal multiple reflections, a shell that already carries a lot of history. […] Many elements of the facade […] allow for modulation of its relationship with its environment and natural control of its climatology.[1]”

    Clemence Guilloteau, Marketing Coordinator at Accsys, added: “At Accsys Technologies, we’re passionate about helping architects achieve their visions by providing materials that are highly sustainable without sacrificing on performance. From the early stages of the project, we worked closely with ECDM to provide a specification that would meet the project’s low carbon requirements.

    “Since Accsys was founded, we have invested heavily in ensuring that Accoya wood achieves the highest possible sustainability credentials. In fact, Accoya was recently re-awarded the Cradle to Cradle® Gold certification and Platinum for Material Health.

    “Accoya wood was the perfect material for use in the BLACK project. It is a fantastic example of an urban development project that has taken sustainability to the next level, saving an incredible 3,000 tonnes of carbon. So, we are delighted that it has been recognised by the prestigious Low Carbon Building Initiative.”


    -
  4. forum rang 8 aextracker 15 april 2024 09:18
    quote:

    Triple A schreef op 15 april 2024 08:58:

    Een bericht dat ik eerder deze week op een andere website vond heeft Accsys nu ook op de eigen website geplaatst.

    [i]The BLACK urban renewal project in the Parisian suburb of Clichy-La-Garenne has been selected by the Low Carbon Building Initiative (LCBI) as one of its fifteen pioneering projects across Europe.

    The LCBI, is a non-profit organisation aiming to reduce carbon emissions in the real estate industry.

    LCBI unites major European real estate stakeholders to promote low carbon buildings in Europe and has created the first pan-European low carbon label measuring the carbon footprint of real estate based on a Life-Cycle Analysis.

    The BLACK project in Clichy is the largest low-carbon building in France. It is a unique development that has been designed with sustainability at its core. Situated right beside Parc des Impressionnistes, the project’s ethical design blends nature’s elements with unique architecture to create a space that sits in harmony with its surroundings.

    “Accoya wood was the perfect material for use in the BLACK project. It is a fantastic example of an urban development project that has taken sustainability to the next level, saving an incredible 3,000 tonnes of carbon.
    -
    Met de hulp van dergelijke NGO's wordt Accsys voorzien van goede gefundeerde promotie om de (nieuw- en her)bouw projekten in Europa te helpen verduurzamen.
    M.b.t. de LCBI en diens 15 andere grote vastgoedprojekten en promotie onder vastgoed exploitanten zullen er nog veel projekten als in Clichy volgen.

    Bepaald geen cliche wat in Clichy gebeurd :) !
  5. forum rang 8 aextracker 16 april 2024 14:59
    quote:

    perry1 schreef op 16 april 2024 09:05:

    Nog dan begin maar met kopen zou ik zeggen
    We zijn er bijna, maar nog niet helemaal.......
    Gaat idd (opnieuw) gebeuren bij koersen einde week < euro 0.67 !
    Bij einde maand koers a > Euro 0.61 stopt de bijkoopambitie van Tracker in Accsys technologies :)
  6. fleurie 17 april 2024 13:07
    vandaag toch nog is een belletje naar Arnhem gedaan.
    zeer vriendelijke dame stond mij te woord
    het werd mij duidelijk dat Amerika opstart juni/juli lastig word daar er mensen opgeleid en gevonden moeten worden
    wel is er veel werk en begint de rust met de nieuwe CEO in te tent terug te keren
    ze was zeer positief over de CEO

    ze kon mij niet vertellen wanner de cijfers naar buiten worden gebracht en verwees mij dit per mail te vragen
    de desbetreffende personen zitten veelal in Engeland

    is er onder ons iemand die kan vertellen wanneer de cijfers komen
588 Posts
Pagina: «« 1 ... 25 26 27 28 29 30 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

Accsys: stilstand is achteruitgang

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links