Ontvang nu dagelijks onze kooptips!

word abonnee
Van beleggers
voor beleggers
desktop iconMarkt Monitor

Aandeel AMG Critical Materials N.V. NL0000888691

Laatste koers (eur) Verschil Volume
19,720   +0,310   (+1,60%) Dagrange 19,450 - 20,440 477.686   Gem. (3M) 379,6K

AMG Critical Materials 2025

2.910 Posts
Pagina: «« 1 ... 125 126 127 128 129 ... 146 »» | Laatste | Omlaag ↓
  1. forum rang 6 Fox WIld 18 april 2025 18:05
    Amsterdam, 18 April 2025 --- AMG Critical Materials N.V. ("AMG", EURONEXT AMSTERDAM: "AMG") announces that AMG Lithium BV has signed an exclusive agreement with Grupo Lagoa to become the first producer of spodumene concentrate in Portugal with an initial capacity of 8,000–9,000 tons per annum by the first half of 2027, pending government approvals. This exclusive agreement builds upon the positive results from our joint pre-engineering efforts since the first announcement of our partnership on August 17, 2023.

    The capital expenditures of approximately 10 million Euros for this commercially sized pilot plant will be provided by AMG in the form of a loan to Grupo Lagoa. In exchange, AMG secures accelerated access to local production of spodumene in Europe to supply its lithium refinery in Germany. The supply from the pilot plant will be based on market prices. Furthermore, this agreement contains terms for the delivery of ore from Grupo Lagoa should AMG Lithium devise to build an industrial size spodumene plant at the Lagoa mine, where exploration is ongoing.

    This partnership presents a unique opportunity for both parties, as we can significantly leverage AMG’s engineering and operating experience in Brazil due to the similarities of our mine and operations there. Grupo Lagoa operates a pegmatite mine supplying the Portuguese ceramic and glass industry since 1984. Leveraging our experience in Brazil, the process will allow for the continued supply of ceramic and glass materials to local customers, very competitive production costs for both feldspar and lithium, and a limited impact on the local environment and communities.

    Fabiano Costa, President of AMG Brazil and Managing Director of AMG Lithium BV, commented, “Our partnership with Grupo Lagoa is a very significant step in establishing a European spodumene production base, building upon longstanding local experience and existing infrastructure. Producing spodumene concentrate and further processing it locally in both Brazil and Europe to supply our battery-grade lithium hydroxide plant in Bitterfeld, Germany is a key part of AMG Lithium’s overall integration strategy.”
  2. forum rang 10 DeZwarteRidder 18 april 2025 18:08
    quote:

    Fox WIld schreef op 18 april 2025 18:05:

    Amsterdam, 18 April 2025 --- AMG Critical Materials N.V. ("AMG", EURONEXT AMSTERDAM: "AMG") announces that AMG Lithium BV has signed an exclusive agreement with Grupo Lagoa to become the first producer of spodumene concentrate in Portugal with an initial capacity of 8,000–9,000 tons per annum by the first half of 2027, pending government approvals. This exclusive agreement builds upon the positive results from our joint pre-engineering efforts since the first announcement of our partnership on August 17, 2023.

    The capital expenditures of approximately 10 million Euros for this commercially sized pilot plant will be provided by AMG in the form of a loan to Grupo Lagoa. In exchange, AMG secures accelerated access to local production of spodumene in Europe to supply its lithium refinery in Germany. The supply from the pilot plant will be based on market prices. Furthermore, this agreement contains terms for the delivery of ore from Grupo Lagoa should AMG Lithium devise to build an industrial size spodumene plant at the Lagoa mine, where exploration is ongoing.

    This partnership presents a unique opportunity for both parties, as we can significantly leverage AMG’s engineering and operating experience in Brazil due to the similarities of our mine and operations there. Grupo Lagoa operates a pegmatite mine supplying the Portuguese ceramic and glass industry since 1984. Leveraging our experience in Brazil, the process will allow for the continued supply of ceramic and glass materials to local customers, very competitive production costs for both feldspar and lithium, and a limited impact on the local environment and communities.

    Fabiano Costa, President of AMG Brazil and Managing Director of AMG Lithium BV, commented, “Our partnership with Grupo Lagoa is a very significant step in establishing a European spodumene production base, building upon longstanding local experience and existing infrastructure. Producing spodumene concentrate and further processing it locally in both Brazil and Europe to supply our battery-grade lithium hydroxide plant in Bitterfeld, Germany is a key part of AMG Lithium’s overall integration strategy.”
    Nog meer verlies voor AMG.........
  3. forum rang 6 Lamsrust 18 april 2025 18:56
    quote:

    Fox WIld schreef op 18 april 2025 18:05:

    Amsterdam, 18 April 2025 --- AMG Critical Materials N.V. ("AMG", EURONEXT AMSTERDAM: "AMG") announces that AMG Lithium BV has signed an exclusive agreement with Grupo Lagoa to become the first producer of spodumene concentrate in Portugal with an initial capacity of 8,000–9,000 tons per annum by the first half of 2027, pending government approvals. This exclusive agreement builds upon the positive results from our joint pre-engineering efforts since the first announcement of our partnership on August 17, 2023.

    The capital expenditures of approximately 10 million Euros for this commercially sized pilot plant will be provided by AMG in the form of a loan to Grupo Lagoa. In exchange, AMG secures accelerated access to local production of spodumene in Europe to supply its lithium refinery in Germany. The supply from the pilot plant will be based on market prices. Furthermore, this agreement contains terms for the delivery of ore from Grupo Lagoa should AMG Lithium devise to build an industrial size spodumene plant at the Lagoa mine, where exploration is ongoing.

    This partnership presents a unique opportunity for both parties, as we can significantly leverage AMG’s engineering and operating experience in Brazil due to the similarities of our mine and operations there. Grupo Lagoa operates a pegmatite mine supplying the Portuguese ceramic and glass industry since 1984. Leveraging our experience in Brazil, the process will allow for the continued supply of ceramic and glass materials to local customers, very competitive production costs for both feldspar and lithium, and a limited impact on the local environment and communities.

    Fabiano Costa, President of AMG Brazil and Managing Director of AMG Lithium BV, commented, “Our partnership with Grupo Lagoa is a very significant step in establishing a European spodumene production base, building upon longstanding local experience and existing infrastructure. Producing spodumene concentrate and further processing it locally in both Brazil and Europe to supply our battery-grade lithium hydroxide plant in Bitterfeld, Germany is a key part of AMG Lithium’s overall integration strategy.”
    Slimme financieringsstructuur. AMG leent Grupo USD10 mln om een pilot plant te bouwen, i.e. de plant wordt eigendom van Grupo dus als het geen succes wordt moet Grupo de USD 10 mln aan AMG terugbetalen. Indien het wel een succes wordt gaat AMG voor eigen rekening en risico - zo lijkt het - een industrial size plant bouwen en levert Grupo de grondstoffen. Die zal dan wel aangebouwd worden tegen de pilot plant, i.e. AMG koopt die dan voor USD 10 mln terug tegen wegstrepen schuld.

    Vooralsnog geen winst of verlies alleen een vordering in de boeken.
  4. forum rang 4 DubbeltjeblijftDubbeltje 20 april 2025 11:46
    quote:

    Lepre Chaun schreef op 20 april 2025 10:51:

    Die thuisbatterijen worden toch steeds goedkopers zeg .

    www.nextenergy.nl/smart-home/plug-in-...
    Thuisbatterijen zijn weggegooid geld. Je kunt er hoogstens 2 of 3 dagen aan electriciteit in opslaan. S'winters heb je er niets aan want dan is het veel te lang somber en in de zomer is er vrijwel altijd voldoende zon. Ook op de mindere zonnige dagen. Dus dan heb je nog niets aan een batterij.
    Je verdient je investering gewoon nooit terug. En je weet dat als je het nu laat installeren je over een paar jaar met een antiek en te duur toestel zit opgescheept.
    Beter is het om te kijken naar een electrische auto die je niet alleen kan opladen maar die je ook als batterij kan gebruiken. Die hebben sowieso een veelvoud aan opslagcapaciteit. Er zijn talloze EV's die dit kunnen.
  5. forum rang 10 DeZwarteRidder 20 april 2025 12:20
    quote:

    DubbeltjeblijftDubbeltje schreef op 20 april 2025 11:46:

    [...]

    Thuisbatterijen zijn weggegooid geld. Je kunt er hoogstens 2 of 3 dagen aan electriciteit in opslaan. S'winters heb je er niets aan want dan is het veel te lang somber en in de zomer is er vrijwel altijd voldoende zon. Ook op de mindere zonnige dagen. Dus dan heb je nog niets aan een batterij.
    Je verdient je investering gewoon nooit terug. En je weet dat als je het nu laat installeren je over een paar jaar met een antiek en te duur toestel zit opgescheept.
    Beter is het om te kijken naar een electrische auto die je niet alleen kan opladen maar die je ook als batterij kan gebruiken. Die hebben sowieso een veelvoud aan opslagcapaciteit. Er zijn talloze EV's die dit kunnen.
    2 of 3 dagen stroom is precies wat er nodig is bij stroomstoringen of rampen.
  6. forum rang 4 DubbeltjeblijftDubbeltje 20 april 2025 13:05
    quote:

    DeZwarteRidder schreef op 20 april 2025 12:20:

    [...]

    2 of 3 dagen stroom is precies wat er nodig is bij stroomstoringen of rampen.
    Dan heb liever een gevulde EV voor de deur met meer capaciteit waaruit ik kan putten
    En ik ga geen 5 a 10 k investeren voor twee dagen electriciteit. Dat overleef ik ook wel zonder electriciteit.
  7. forum rang 10 DeZwarteRidder 20 april 2025 18:29
    quote:

    DubbeltjeblijftDubbeltje schreef op 20 april 2025 13:05:

    [...]
    Dan heb liever een gevulde EV voor de deur met meer capaciteit waaruit ik kan putten
    En ik ga geen 5 a 10 k investeren voor twee dagen electriciteit. Dat overleef ik ook wel zonder electriciteit.
    Hun batterij kost 999 euro en is stekkerklaar.
2.910 Posts
Pagina: «« 1 ... 125 126 127 128 129 ... 146 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.