Ontvang nu dagelijks onze kooptips!
word abonnee
sluiten ✕
Terug naar discussie overzicht
Voor diegenen die deze afsplitsing van Gold Fields nog bezitten, sinds vandaag noteren ze onder een andere naam en andere tracker: de ADR (U.S.):SBSW, laatste koers 10.93$. In order to effect an internal restructuring which creates a more efficient group structure, the group announces a firm intention in respect of an offer by Sibanye-Stillwater to acquire 100% of the issued ordinary share capital of Sibanye Gold Limited, by way of a scheme of arrangement and the listing of Sibanye-Stillwater shares on the Johannesburg Stock Exchange and American Depositary Shares on the New York Stock Exchange to replicate the listings of SGL. The current corporate structure of Sibanye Gold Limited has the current South African gold assets at holding company level With the growth of the Company the PGM acquisitions of Aquarius, Rustenburg Platinum, Stillwater and more recently Lonmin have been incorporated as subsidiaries of the holding company To ensure structural flexibility and efficiency it is deemed appropriate to have the gold assets included as a subsidiary of the holding company This effectively requires a new holding company to be listed with the same shareholders and exactly the same shares in the new holding company to be issued to existing shareholders. The new holding company will replicate the corporate governance structures and policies of Sibanye Gold Limited. This will be achieved through a proposed scheme of arrangement The new holding company will be called Sibanye-Stillwater and the gold subsidiary will retain the name Sibanye Gold Limitedwww.sibanyestillwater.com/news-invest...
Sibanye-Stillwater approves the development of the second phase of its Keliber lithium project Johannesburg, 6 October 2023: Sibanye-Stillwater (JSE: SSW and NYSE: SBSW) is pleased to announce that it has approved the commencement of the second phase of its Keliber lithium project which includes the construction of the concentrator and the development of the Syväjärvi open pit mine in Päiväneva in Finland. Delivery of ore from the Syväjärvi open pit mine will be timed to coincide with the commissioning of the concentrator. The environmental permit for phase two was received in December 2022, which enables the development to continue. The appeal lodged by Sibanye-Stillwater, querying the terms of six of the 144 permitting conditions (refer thevault.exchange/?get_group_doc=245/... environmental-permit-rapasaari-and-paivaneva-concentrator-06feb2023.pdf) will continue in parallel with the construction. Due to the nature of the appeal, the permission to commence construction has not been withdrawn. Higher capital expenditures have been planned to meet the more stringent effluent water quality conditions. The capital expenditure for the concentrator is now forecasted at €230 million, which is €10 million higher than the previous estimate. This increase is due to the revision of the effluent water treatment facility at the Keliber lithium refinery. We have incorporated amended technology into the flowsheet to ensure compliance with environmental permits, which will also result in increased recoveries. Despite the higher capital requirements, the adjustment has not had a negative impact on the net present value of the project due to the positive impact of the expected recoveries. The updated aggregated project capital for the Keliber project is estimated at €656 million (2023 real terms) including contingencies (previously €588 million in 2022 real terms). The equity funding for the project has already been secured and completed, while the finalisation of the debt funding is in progress. More details on the capital and expected production profile will be shared by Sibanye-Stillwater at its virtual battery metals investor day on Tuesday, 14 November 2023 with a live presentation shared via a webcast (link: themediaframe.com/mediaframe/webcast.... and conference call (register on:services.choruscall.za.com/DiamondPas... SecurityString=5ce1569ad) at 13h00 (CAT) / 11h00 (GMT) / 06h00 (EST) / 04h00 (MT). Neal Froneman CEO of Sibanye-Stillwater said ”We are pleased to be commencing construction of the lithium concentrator and Syväjärvi mine. The Keliber lithium project remains on track to be the first integrated lithium hydroxide supplier in Europe. We look forward to working with all stakeholders to deliver this exceptional project, which will contribute to the regional economy as well as to the growth of our unique portfolio of green metals that aim to reverse climate change.”
Aantal posts per pagina:
20
50
100
Direct naar Forum
-- Selecteer een forum --
Premium
Word nu abonnee van IEX en krijg onbeperkt toegang tot onze (koop)tips en succesvolle modelportefeuilles. Nu 3 maanden voor slechts €19,95! Profiteer van 58% korting!
Word abonnee