Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel AMG Critical Materials N.V. AEX:AMG.NL, NL0000888691

  • 23,780 19 apr 2024 17:37
  • -0,720 (-2,94%) Dagrange 23,540 - 24,160
  • 191.650 Gem. (3M) 245,7K

AMG - 2022: dit jaar moet het gebeuren!

9.510 Posts
Pagina: «« 1 ... 256 257 258 259 260 ... 476 »» | Laatste | Omlaag ↓
  1. forum rang 4 tmaster 28 juli 2022 13:21
    Strategic Highlights

    Construction and commissioning of the new vanadium spent catalyst recycling facility in Zanesville, Ohio is proceeding as planned. The roaster is fully operational, and the entire plant is expected to be at run-rate capacity by the end of the fourth quarter of 2022.
    The project to expand the spodumene production in AMG Brazil is on time and on budget. The objective is to be in full production in the second half of 2023 or earlier.
    AMG Lithium has started construction of the first European lithium refinery, and commissioning for the first module of the battery-grade lithium hydroxide upgrader will commence in the second half of 2023.
    AMG’s first lithium vanadium battery (“LIVA”) for industrial power management applications is proceeding as planned and the objective is to be fully operational in the fourth quarter of 2022.
    Shell & AMG Recycling B.V. (“SARBV”) and its partner, the United Company for Industry (“UCI”), have signed an agreement with Saudi Arabian Oil Company (“Aramco”). Basic engineering has begun on the first of four projects to build, own and operate a conversion plant of vanadium-containing gasification ash supplied by Aramco into vanadium oxide and vanadium electrolyte.

    Ziet er allemaal prima uit. Duidelijk is dat vanaf volgend jaar inkomsten en groei in een stroomversnelling kunnen raken. Nu veel kosten door allerlei investeringen maar die ga je vanaf volgend jaar terug zien in de inkomsten stroom.
  2. forum rang 5 geldmaker 28 juli 2022 13:26
    quote:

    Fox WIld schreef op 28 juli 2022 12:56:

    [...]

    iborrowdesk.com/report/AMG.LN

    Een week geleden waren nog 1,1 miljoen aandelen te leen via iborrowdesk (zie link), nu nog maar 150.000 stuks.
    Ze hebben 600.000 opgenomen om mee te kl.ten.
    Wat een besmet aandeel bljft het.
    Niet te rijmen..
  3. w.o. omhoog 28 juli 2022 13:27
    De outlook verhoging van AMG 280-300 ligt onder de consensus van 309 dat ene zinnetje zorgt voor deze Jojo beweging. Cijfers verder goed. Als je niet de consensus outlook gaat verslaan kan je de cijfers gewoon voorbeurs brengen.. maar dat is mijn Bescheiden mening.

    Allemaal Theater om niks nu..
  4. r66 28 juli 2022 13:28
    quote:

    tmaster schreef op 28 juli 2022 13:21:

    Strategic Highlights

    Construction and commissioning of the new vanadium spent catalyst recycling facility in Zanesville, Ohio is proceeding as planned. The roaster is fully operational, and the entire plant is expected to be at run-rate capacity by the end of the fourth quarter of 2022.
    The project to expand the spodumene production in AMG Brazil is on time and on budget. The objective is to be in full production in the second half of 2023 or earlier.
    AMG Lithium has started construction of the first European lithium refinery, and commissioning for the first module of the battery-grade lithium hydroxide upgrader will commence in the second half of 2023.
    AMG’s first lithium vanadium battery (“LIVA”) for industrial power management applications is proceeding as planned and the objective is to be fully operational in the fourth quarter of 2022.
    Shell & AMG Recycling B.V. (“SARBV”) and its partner, the United Company for Industry (“UCI”), have signed an agreement with Saudi Arabian Oil Company (“Aramco”). Basic engineering has begun on the first of four projects to build, own and operate a conversion plant of vanadium-containing gasification ash supplied by Aramco into vanadium oxide and vanadium electrolyte.

    Ziet er allemaal prima uit. Duidelijk is dat vanaf volgend jaar inkomsten en groei in een stroomversnelling kunnen raken. Nu veel kosten door allerlei investeringen maar die ga je vanaf volgend jaar terug zien in de inkomsten stroom.
    Op 4-5:
    AMG Brazil will increase its spodumene production by 40,000 tons, bringing its production capacity to 130,000 tons per annum. The project is proceeding as planned, construction will begin in the third quarter of 2022; and commissioning will commence in the second quarter of 2023.

    Dus verschoven richting 2e helft van 2023. Alleen staat er steeds bij dat alles volgens plan gaat.
  5. forum rang 7 Hopper58 28 juli 2022 13:30
    quote:

    r66 schreef op 28 juli 2022 13:28:

    [...]

    Op 4-5:
    AMG Brazil will increase its spodumene production by 40,000 tons, bringing its production capacity to 130,000 tons per annum. The project is proceeding as planned, construction will begin in the third quarter of 2022; and commissioning will commence in the second quarter of 2023.

    Dus verschoven richting 2e helft van 2023. Alleen staat er steeds bij dat alles volgens plan gaat.
    Ik denk dat commisioning nog iets anders is als in volle productie gaan.
9.510 Posts
Pagina: «« 1 ... 256 257 258 259 260 ... 476 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

AMG ziet enorme kansen in recyclen van plutonium

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links