Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel VESTAS WIND SYSTEMS AS FSE:A3CMNS.FFM, DK0061539921

  • 23,500 18 apr 2024 09:10
  • -0,040 (-0,17%) Dagrange 23,500 - 23,500
  • 300 Gem. (3M) 2,1K

Forum Vestas Wind Systems geopend

354 Posts
Pagina: «« 1 2 3 4 5 6 ... 18 »» | Laatste | Omlaag ↓
  1. forum rang 10 voda 7 oktober 2020 15:24
    Vestas secures 25 MW auction win in Germany

    Vestas has signed a 25 MW contract with long-standing customer PNE AG for the Boitzenhagen wind project in Lower Saxony, Northern Germany. The order is derived from Germany's fourth wind energy auction in 2020. In close collaboration with PNE AG, Vestas developed a site-specific wind energy solution that features one V126-3.45 MW turbine at 137m hub height, and six V136-3.45 MW turbines delivered in 3.6 MW Power Optimised Mode at 132m hub height in combination with a long-term service agreement. The tailored solution leverages the flexibility of the 4 MW platform to maximise the project’s energy production, while catering for local requirements.

    The contract further includes supply, installation and commissioning of the wind turbines, as well as 20-year Active Output Management 4000 (AOM 4000) service agreement. The project will feature a VestasOnline® Business SCADA solution, lowering turbine downtime and thus optimising the energy output.

    Deliveries and commissioning are expected to begin in the fourth quarter of 2021.

    Source : STRATEGIC RESEARCH INSTITUTE
  2. forum rang 10 voda 8 oktober 2020 15:12
    Vestas Wins 252 MW EPC Order in Egypt

    The New and Renewable Energy Authority has placed a 252 MW order with Vestas for the Gulf of Suez 1 wind project in Gulf of Suez, Egypt. Vestas has developed a solution that comprises the supply and installation of 70 V105-3.45 MW wind turbines in 3.6 MW Power Optimised Mode and a three-year Active Output Management 4000 service agreement, capable of maximising the project’s annual energy production, while meeting the local tip-height restriction and the national grid code requirements. Leveraging Vestas’ experience from more than 4 GW of turnkey projects across the globe, Vestas will also manage the engineering, procurement and construction side of the project, which includes related civil and electrical works and the substation for the connection to the national grid.

    The project’s annual production is expected to reach 1027 GWh of clean energy and according to NREA save around 560,000 tonnes of CO2 emissions annually. It will be jointly financed by the European Investment Bank, KfW, Agence Française de Développement and the European Commission.

    Vestas was one of the first contributors to the development of Egypt’s wind energy infrastructure with the installation of 123 Vestas wind turbines in Hurghada and Zafarana in 2004. Vestas currently has more than 1.5 GW of installed or under construction capacity in the Middle East and North Africa region including Jordan, Saudi Arabia, the United Arab Emirates, Bahrain, Morocco, Senegal, and Cape Verde. With a growing number of renewable energy projects planned or underway and with ambitious renewable energy targets in nearly all countries, the region is now seen to be a significant and promising player in the global energy transition.

    The Gulf of Suez 1 wind project is planned to be fully operational in 2023.

    Source : STRATEGIC RESEARCH INSTITUTE
  3. [verwijderd] 8 oktober 2020 15:15
    Voda, de laatste 5 artikelen zijn al minstens een week oud. Ik weet niet of je een script hebt geschreven dat deze artikelen automatisch geplaatst worden, of dat je dit allemaal met de hand doet. Wellicht een optie om ze te scripten zodat je altijd de actuele berichten kunt delen.
  4. forum rang 10 voda 12 oktober 2020 14:02
    Vestas Upgrades EnVentus Turbines to 6.0 MW & Installs V162-6.0 MW Prototype

    Demonstrating its continued focus on innovation and product development, Vestas has upgraded the EnVentus platform’s existing turbine variants to 6.0 MW standard rating. The upgrade to 6.0 MW delivers an increase in energy production of more than three percent compared to 5.6 MW depending on site-specific conditions, while siteability parameters are maintained. The upgrade is enabled by advancements in load assessment and hardware upgrades specific to generator, gearbox and cooling system.

    At the same time, Vestas is installing the V162-6.0 MW prototype turbine at the Østerild National test centre for large wind turbines in Western Jutland, Denmark. It will be installed next to the V150-5.6 MW prototype that is already upgraded to 6.0MW. Following final installation of the V162-6.0 MW turbine in mid-October, the prototype will undergo an extensive test and verification programme to ensure reliability before serial production commences in the second quarter of 2021.

    With tip height up to 250m and a swept area of more than 20,000m2, the V162-6.0 MW applies the largest rotor size in the Vestas portfolio to maximise energy production at low to medium wind sites.

    Introduced in 2019, the Enventus platform is the next generation of Vestas technology, building on and leveraging proven technology from the 2 MW, 4 MW and 9 MW platforms to meet customisation needs more efficiently through advanced modularity. Since the launch of the EnVentus platform, Vestas has secured orders for more than 1 GW across four different markets.

    Source : STRATEGIC RESEARCH INSTITUTE
  5. forum rang 10 voda 12 oktober 2020 14:18
    Vestas receives 185 MW order in the USA

    Vestas has received a 185 MW order of V150-4.2 MW turbines in 4.3 MW Power Optimised Mode for a wind project in the USA. The order includes supply and commissioning of the turbines as well as a 20-year service agreement, designed to ensure optimised performance for the lifetime of the project. Turbine delivery is scheduled for the second quarter of 2021 with commissioning scheduled for the fourth quarter of 2021.

    The customer and project are undisclosed per the customer’s request.

    Source : STRATEGIC RESEARCH INSTITUTE
  6. forum rang 10 voda 13 oktober 2020 14:53
    Vestas Secures Ninth Intertidal Wind Project in Vietnam

    An order for a 29 MW wind project from the Vietnamese developer, Soc Trang Energy Joint Stock Company, a subsidiary of Xuan Cau Company Limited, has underlined Vestas’ ability to provide site-specific solutions for complex and challenging site conditions that require careful planning and execution. Located in Soc Trang, a province in the Mekong Delta of southern Vietnam, the Soc Trang 7 wind project will feature seven V150-4.2 MW turbines with customised towers placed on reinforced onshore foundations raised above sea level in the shallow near-shore waters.

    Vestas will work closely with the customer to handle the complexity of planning and executing the intertidal project, and will supervise the installation of the turbines, strategically placed to exploit the full potential of the Mekong Delta region’s favourable wind conditions. This will be Vestas’ ninth intertidal order since winning its first intertidal order in Vietnam less than a year ago in December 2019.

    The order also includes a 20-year Active Output Management 5000 (AOM 5000) service agreement, designed to maximise energy production for the site. With a yield-based availability guarantee, Vestas will provide the customer with long-term business case certainty.

    The project is planned to achieve commissioning in the third quarter of 2021.

    Source : STRATEGIC RESEARCH INSTITUTE
  7. [verwijderd] 14 oktober 2020 10:15
    quote:

    FroazZ schreef op 30 september 2020 19:00:

    Waarom zou je nu verkopen? Afgelopen week heeft Vestas voor ongeveer 800 MW aan nieuwe orders binnen gekregen, waarvan twee orders voor 185 en 184 MW in de USA en een gigantische order voor 250 MW in Egypte. De omzet per MW voor Vestas ligt rond de 0,8 miljoen, dit betekent dat het orderboekje in de afgelopen week met 0,8*800mil = 640 miljoen is gestegen. Hierbij zijn ook service agreements afgeloten, hier vangt Vestas een hele dikke marge op.

    Dat het bedrijf in deze roerige tijden over de hele wereld orders binnenkrijgt (deze week: Polen, Nederland, Duitsland, Italië, Griekenland, USA, Vietnam, Egypte) geeft aan dat dit bedrijf mondiaal solide presteert. Voor mij ook een positief teken zijn de twee orders in de USA, waar nog enorm veel te halen valt, met name wanneer Biden president wordt. Ik zie dit aandeel in de aanloop naar de volgende kwartaalcijfers richting de 1150 DKK gaan en blijf zeer comfortabel zitten. Ik ben zelfs bereid om mijn positie in dit aandeel bij te kopen, zelfs op 1030 DKK.

    Groet
    Ging sneller dan verwacht :)
  8. forum rang 10 voda 14 oktober 2020 14:32
    MHI Vestas Ramps Up Activity at Triton Knoll Pre Assembly Hub

    MHI Vestas has moved in to Able Seaton Port in Hartlepool ready to install 90 of its V164-9.5 MW turbines at the Triton Knoll project in Q1 2021. This signals a major ramp up in MHI Vestas’ UK offshore wind activity supporting the leading role of offshore wind in the delivery of the UK’s Net Zero ambitions, while helping drive a green economic recovery from the ongoing COVID pandemic. ASP will serve as the turbine logistics and pre-assembly hub for the project, with components expected to arrive from next month. Turbine tower sections, blades and nacelles will be marshalled and pre-assembled at ASP, before being loaded onto vessels for transport to the wind farm.

    Triton Knoll, the 857 MW offshore wind farm, is being built by RWE Renewables in partnership with J-Power and Kansai Electric Power, and is RWE’s most powerful offshore project under construction. The wind farm will be powered by 90 MHI Vestas V164-9.5 MW turbines, which are due to be installed 32km off the Lincolnshire coast beginning in Q1 next year. Each turbine consists of 80m long blades, which are manufactured at MHI Vestas’ facility on the Isle of Wight, and finished at its Fawley plant across the Solent. The Fawley facility is a decommissioned, oil-fired power plant that has been repurposed into a state-of-the-art painting and logistics facility for the 80m-long blades.

    Port owner Able UK carried out extensive site preparation works from November last year, to create a site suitable for MHI Vestas to move into. MHI Vestas, in turn, has now begun to prepare the site at ASP site for the impending arrival of turbine components, prioritising UK companies in the delivery of the project. As a result, ASP now hosts technicians on-site from local suppliers, including Global Wind Service, Dawson and Boston Energy, as well as MHI Vestas employees. The main crane and Self-Propelled Modular Transporter to be used at ASP for moving turbine components will be supplied by Weldex, based out of Alfreton, UK.

    MHI Vestas will be installing several projects across the UK and Scotland in the coming years, including Triton Knoll, Moray East, Seagreen and Kincardine. These projects will continue to be supplied by MHI Vestas’ blade facility in the Isle of Wight and supported from existing offices in Warrington and London. MHI Vestas currently employs 1,096 people in the UK, all focused on delivering clean offshore wind energy to meet the UK government’s ambition of increasing new offshore wind capacity to 40GW by 2030.

    Source : STRATEGIC RESEARCH INSTITUTE
  9. forum rang 10 voda 14 oktober 2020 14:41
    Vestas Secures Ninth Intertidal Wind Project in Vietnam

    An order for a 29 MW wind project from the Vietnamese developer, Soc Trang Energy Joint Stock Company, a subsidiary of Xuan Cau Company Limited, has underlined Vestas’ ability to provide site-specific solutions for complex and challenging site conditions that require careful planning and execution. Located in Soc Trang, a province in the Mekong Delta of southern Vietnam, the Soc Trang 7 wind project will feature seven V150-4.2 MW turbines with customised towers placed on reinforced onshore foundations raised above sea level in the shallow near-shore waters.

    Vestas will work closely with the customer to handle the complexity of planning and executing the intertidal project, and will supervise the installation of the turbines, strategically placed to exploit the full potential of the Mekong Delta region’s favourable wind conditions. This will be Vestas’ ninth intertidal order since winning its first intertidal order in Vietnam less than a year ago in December 2019.

    The order also includes a 20-year Active Output Management 5000 (AOM 5000) service agreement, designed to maximise energy production for the site. With a yield-based availability guarantee, Vestas will provide the customer with long-term business case certainty.

    The project is planned to achieve commissioning in the third quarter of 2021.

    Source : STRATEGIC RESEARCH INSTITUTE
  10. forum rang 10 voda 15 oktober 2020 15:28
    Vestas Wins 109 MW Order in Chile

    The global wind and solar development company, Mainstream Renewable Power has placed an order for the 109 MW Ckani Wind Park, to be located in the Antofagasta region, in Chile. The contract includes the supply and installation of 26 V150-4.2 MW wind turbines, as well as an Active Output Management 5000 service agreement for the operation and maintenance of the wind park over the next 20 years.

    The 109 MW Ckani project, that was awarded in the auction held in 2016, adds to the more than 1.5 GW of Vestas’ turbines already installed or under construction in the country.

    The Ckani wind park is expected to reach commercial operation in 2021.

    In 2001, Vestas pioneered wind energy in Chile with the 2 MW Alto Baguales wind park. With this new order, the company consolidates its 40 percent market share in the country.

    Source : STRATEGIC RESEARCH INSTITUTE
  11. forum rang 10 voda 16 oktober 2020 16:11
    Vestas Secures 40 MW Order for Three Projects in Poland

    Vestas has received a 40 MW order from Eurowind Energy A/S, a leading developer and operator of sustainable energy projects for three wind parks in Poland. The three projects are developed through Eurowind Energy’s joint venture in Poland E&W project. Located in the Wagrowiec, Oborniki and Wyrzysk provinces in the north-western part of the country, the projects will consist of V100-2.0 MW wind turbines combined with 120m towers and long-term service contracts, maximising power production while at the same time offering competitive levelised cost of energy.

    Earlier this quarter, Vestas announced it has secured more than 1.5 GW of wind projects in Poland since the country introduced its auction system in 2018. This new order further consolidates Vestas' market leadership in the Polish renewable energy sector and builds on an installed base of more than 2.2 GW. Vestas has been operating in Poland since 2002 and employs around 400 people in the country.

    The contracts further include supply, installation and commissioning of the wind turbines, as well as 20-year Active Output Management 4000 (AOM 4000) service agreements for the three wind parks. The projects will feature a VestasOnline Business SCADA solution, lowering turbine downtime and thus optimising the energy output.

    Deliveries are planned for the third quarter of 2021.

    Source : STRATEGIC RESEARCH INSTITUTE
  12. forum rang 10 voda 19 oktober 2020 15:53
    Vestas wins 184 MW order in USA & Secures 10 GW of Order Intake in 2020

    Vestas has received a 184 MW order of V120-2.2 MW and V110-2.2 MW wind turbines in the USA, which takes Vestas’ order intake in 2020 across the 10 GW mark before entering the fourth quarter.

    The order includes supply and commissioning of the turbines as well as a multi-year service agreement. Turbine delivery is scheduled to begin the second quarter of 2021, with commissioning scheduled for the fourth quarter of 2021.

    The customer and project are undisclosed per the customer’s request.

    Source : STRATEGIC RESEARCH INSTITUTE
  13. forum rang 10 voda 20 oktober 2020 15:15
    Vestas Secures 8 MW Order in USA

    Vestas has received an 8 MW order of 4 MW platform turbine components that qualify for the 60 percent PTC value from an undisclosed customer. These components will enable future wind energy projects that complete construction by the end of 2024.

    The PTC terms set in the PATH act, passed by Congress in 2015, made the wind industry the first energy industry to agree to permanent tax reform and have resulted billions of dollars in wind energy investment in the U.S., including expansions in domestic manufacturing and supply chain, construction, transportation, tax revenue to local communities, and the addition of tens of thousands of jobs across the wind value chain.

    Source : STRATEGIC RESEARCH INSTITUTE
  14. [verwijderd] 20 oktober 2020 16:57
    Denk dat de koers tot de q4 cijfers zullen consolideren. Sinds q3 is er al 35-40% op de koers bijgekomen. Ook de verkiezingen in de VS zullen voor onzekerheid zorgen, een presidentschap met Biden zal Vestas ten goede komen. Mijn persoonlijke koersdoelen voor eind 2020 zijn 1200 DKK en 1450DKK voor 2021.
  15. kiekes 21 oktober 2020 02:29
    Het is allemaal knip en plakwerk hier dan mag deze niet ontbreken een order van 26 gw -)

    October 20 (Renewables Now) - The government of Western Australia said it has granted state environmental approval for the 15-GW first stage of the Asian Renewable Energy Hub, a massive wind and solar power project planned for the Pilbara region.

    In the long term, the project will reach 26 GW of renewables and incorporate green hydrogen and ammonia production for both domestic use and overseas markets. At least 3 GW of the power will be destined for large users in Pilbara.

    The Asian Renewable Energy Hub was proposed by a consortium formed by renewable energy projects developer CWP Energy Asia, bank Macquarie Group Ltd (ASX:MQG), green fuels company InterContinental Energy and wind turbine maker Vestas Wind Systems A/S (CPH:VWS). The first stage will generate 10 GW of wind and 5 GW of solar power. Once all 26 GW of turbines and panels are installed, the mega-plant will occupy 6,500 square kilometres (2,510 sq miles) of traditional land of the Nyangumarta People in the East Pilbara region.

    The developing consortium said it has engaged with the traditional land owners since the start.

    According to the project’s website, the financial investment decision is expected in 2025, while construction is planned to start the following year.

    The construction period will take a decade, during which 5,000 jobs will be created, while the operations phase will open 3,000 direct jobs over 50-plus years, the Western Australian government said.
354 Posts
Pagina: «« 1 2 3 4 5 6 ... 18 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium drie voorbeelden van IEX Premium: de exclusieve content op de site, de app op een smartphone en IEX Magazine.

Benieuwd naar onze analyses en kooptips?

Word nu abonnee van IEX en krijg onbeperkt toegang tot onze (koop)tips en succesvolle modelportefeuilles. Nu 3 maanden voor slechts €19,95! Profiteer van 58% korting!

Word abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links