Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Windpower - Europe

2.053 Posts
Pagina: «« 1 ... 62 63 64 65 66 ... 103 »» | Laatste | Omlaag ↓
  1. forum rang 10 voda 30 juni 2020 15:55
    Nordex Group to supply 43 MW Turbines to ABO Kokkoneva Wind from Finland

    Nordex Group has received an order from its major customer ABO Wind for the supply and installation of nine N149/4.0-4.5 turbines for the Finnish project Kokkoneva. The turbines will be supplied in the 4.8 MW operating mode. The contract also includes a premium service contract of the turbines for the term of 15 years with an extension option to 25 years.

    The 43.2 MW wind farm Kokkoneva will be built south of Kestilä in the municipality of Siikalatva in north-eastern Bottnia, not far from Lake Oulujärvi. The Nordex Group supplies the wind turbines in the cold climate version and installs them on tubular steel towers with a hub height of 155 metres. This enables the turbines to generate the highest possible yield at the site, which has an average annual wind speed of 7.4 m/s. The start of the installation is scheduled for the second half of 2021.

    In 2019, ABO Wind was awarded the contract to operate the Kokkoneva wind farm in the first technology-neutral tender for renewables in Finland. “

    Source : Strategic Research Institute,
  2. forum rang 10 voda 30 juni 2020 15:59
    Vestas, Rabobank and Windpark Zeewolde partner up to build Netherland’s largest onshore wind project

    Windpark Zeewolde BV, Vestas and Rabobank have closed contracts for wind turbines and financing for the Windpark Zeewolde project in the Netherlands. Windpark Zeewolde BV, a unique collaboration of more than 200 local farmers, residents and entrepreneurs of the Netherlands, has placed an order for 83 Vestas wind turbines totaling 322 MW for the wind project Zeewolde. The project is in the outskirts of Zeewolde, close to the IJsselmeer, on an area that covers over 300 square kilometers.

    The wind park currently consists of more than 200 turbines which will be replaced by new Vestas turbines that will generate almost three times more energy with less than half the number of turbines, demonstrating the large potential in replacing older turbines with new and more efficient variants.

    The financing of the windfarm will be arranged by Rabobank that will provide both the junior debt and a senior debt loan of approximately EUR 500 million for the construction of the project. Rabobank was keen to support the financing of this project, due to its cooperative structure comprising of a large client base of the bank in addition to supporting the energy transition.

    Vestas has developed a customised solution that comprises a mix of turbine variants from the 2 MW and 4 MW platforms and a 20-year Active Output Management service contract, capable of maximising the annual energy production while meeting local restrictions.

    The delivery of the wind turbines is expected to begin in the first quarter of 2021. The entire park will be completed in 2022, and it will be the largest onshore wind farm in the Netherlands and the largest community-owned windfarm in Europe.Once repowered, the Zeewolde wind project will generate electricity for more than 250.000 local households.

    Source : Strategic Research Institute
  3. forum rang 10 voda 30 juni 2020 16:12
    Jack-Up Vessel off Redcar Coast for Sofia Offshore Wind Farm

    Innogy announced that a 29 metre long jack-up vessel will be at work in the nearshore area between Redcar and Marske-by-the-Sea from this week to conclude a six-month offshore site investigation by service provider Fugro for Sofia Offshore Wind Farm. The jack-up vessel Haven Seariser 2 will be visible to local residents and coast visitors for approximately a month while it carries out a series of boreholes. The boreholes together with earlier surveys will gather data that will feed into the planning of the final design and installation methodology for the main transmission cable where it reaches landfall. As well as the towing vessel, the jack-up will be supported by a local guard vessel and a rigid inflatable boat to allow crew changes.

    The vessel has four legs that will be lowered to the seabed, enabling it to lift up above the water and create a steady platform for each borehole to be safely carried out. It will be towed between borehole sites by a towing vessel and is due to leave the area by the end of July.

    Sofia, the largest project in innogy’s development portfolio and one of the world’s biggest offshore wind farms, will be located on Dogger Bank, in the North Sea. The power generated by the wind farm will travel via a 220 kilometre long electricity export cable from the offshore converter platform to shore, at its landfall between Redcar and Marske-by-the-Sea.

    From landfall, onshore cables will transport the power to a new onshore converter station to be built near the village of Lazenby, adjacent to the Wilton Complex. Construction is due to start onshore in early 2021.

    Sofia Offshore Wind Farm is 100% owned by innogy SE

    Source : Strategic Research Institute
  4. forum rang 10 voda 1 juli 2020 16:59
    Vestas Secures 28 MW Orders in Germany with EnVentus Turbines

    Vestas has received a 28 MW repowering order from ecoJoule construct GmbH for the wind project Brest, located in Lower-Saxony in northern Germany, won in the tender for the Federal Network Agency. Five V150-5.6 MW turbines from the EnVentus platform, with concrete hybrid towers with a hub height of 166m, will replace the currently installed turbines to maximise the annual energy production. The project will feature a VestasOnline Business SCADA solution, lowering turbine downtime and thus optimising the energy output. The contract further includes supply, installation and commissioning of the wind turbines, as well as a 20-years Active Output Management 5000 service agreement. Deliveries are expected to begin in the second quarter of 2021, while commissioning is planned for the third quarter of 2021.

    Vestas recently expanded its industry leading tower portfolio of different tower technologies and heights by concrete hybrid towers. Towers with hub heights of 166 and 169 meters are certified for the V162-5.6 MW and the V150-5.6 MW turbine variants of the EnVentus platform for Germany and Austria. The new tower offering highlights the benefits of the modular EnVentus platform that enables increased flexibility and optimisation towards local conditions. In addition, the hybrid tower solution will reduce the turbines’ CO2 footprint by more than 20 percent compared to steel tower solutions.

    The repowering doubles the project’s capacity so that it will generate enough electricity to power the entire Brest municipality and in addition about a quarter of the local households in the Stade district.

    Source : Strategic Research Institute
  5. forum rang 10 voda 2 juli 2020 15:05
    Siemens Gamesa to Shut Down Factory in Aoiz in Navarre

    Siemens Gamesa needs to adapt to the challenging market conditions of the wind industry, characterized by strong competition and price pressures that have deteriorated the margins of wind turbine manufacturers. To succeed in that environment and increase the competitiveness of its onshore business, the company will focus on the next generation of large turbines, with rotors of up to 170 meters. These models already represent almost half of the current demand and are crucial to increase its profitability and bring further down the cost of clean energy.

    To successfully advance that strategy, Siemens Gamesa has decided to shut down its Aoiz factory, which is not competitive in the market environment to produce blades for large turbine models. The Navarre plant manufactures the SG 3.4-132 for projects located primarily in Spain. Its higher costs and geographical position, more than 200 km away from the closest port, make it uncompetitive for global markets.

    The company will start a collective dismissal procedure for a maximum of 239 employees. Negotiations with local workers council are intended to start in the coming days, in accordance with applicable rules and regulations. Information on the final agreements will be communicated once negotiations are completed.

    While this activity is not directly linked to the COVID-19 crisis, the effects of the pandemic in Siemens Gamesa operations and commercial activity have accentuated the need for action. The company reported a direct impact of 56 million euros in its profitability during the last quarter.

    Source : Strategic Research Institute
  6. forum rang 10 voda 3 juli 2020 15:44
    Iberdrola Acquires French Renewables Company Aalto Power

    Iberdrola has finalised the acquisition of the French renewable energy company Aalto Power, owned by Aiolos y Caisse des Dépôts et Consignations for EUR 100 million. Founded in 2005 and based in Marseilles, Aalto Power currently has 118 megawatts of onshore wind generation operational in France and a portfolio of onshore wind projects in the country totalling a further 636 MW, at various stages of development. The transaction is subject to compliance with the usual conditions precedent for this type of transaction, mainly approval from the French Finance Ministry, is part of Iberdrola's commitment to boosting its presence and growth in renewable energy in France.

    In fact the purchase of Aalto Power will not only provide Iberdrola with its first operational megawatts on French soil, but will also boost its plans in the area of renewable generation, thanks to the company's projects and its team of professionals with experience in the development of this type of infrastructure.

    In France, Iberdrola is already progressing the Saint-Brieuc offshore wind farm, of which it took over 100% of the capital in March, and which will involve an investment of approximately EUR 2.5 billion. The 496 MW of power from this complex, which will begin construction in 2021 and come onstream in 2023, will supply enough clean energy to meet the electricity needs of some 835,000 people. Located about 16 kilometres off the coast of Brittany, the Saint-Brieuc farm will use 62 Siemens Gamesa turbines, of 8 MW each, spread over an area of around 75 square kilometres. The turbines will be 207 meter high in total.

    Source : Strategic Research Institute
  7. forum rang 10 voda 6 juli 2020 16:07
    Van Oord Selects BAUER Spezialtiefbau for Piling Works for Saint-Brieuc Offshore Wind Farm

    The Dutch marine contractor Van Oord awarded German specialist foundation company BAUER Spezialtiefbau GmbH to install 190 bored piles at 62 locations for 3-legged jackets, as well as one substation location consisting of a 4 legged jacket foundation. Van Oord will start the offshore operations in 2021 with the installation of the bored piles using its offshore installation vessel Aeolus. The Aeolus will be assisted by a second vessel in 2022 to install jackets foundations. The commercialization will start in 2023.

    BAUER Spezialtiefbau GmbH is going the provide and operate the drilling and grouting operations for the subsea operation, including the use of three newly designed BAUER Dive Drills DD 40 U, which will work simultaneously up to 47 m penetration depth in a rock structure up to 160 MPa and in a water depth of up to 37 m. Finally, onboard of OIV Aeolus Bauer will execute grouting operations to fix the 190 bored piles at the drilling location.

    Saint-Brieuc offshore wind farm will be the first large-scale offshore wind farm in Brittany and one of the first in France to obtain all the necessary government permits for its construction and operation. It will be built on an area of 75 square klometers and comprise 62 turbines with a capacity of 8 MW each. So in total, the wind farm will have a capacity of 496 MW. Located approxiimately 16 kilometers off the French coast, the wind farm will produce 1,820 GWh per year, the equivalent of the annual electricity consumption of 835,000 people including heating.

    Iberdrola group, in collaboration with French companies RES and Caisse des Dépôts, both belonging to the consortium Ailes Marines of Iberdrola, has finished the first phase of construction of the project: analysis of the technical and environmental conditions of the site. This first step involved installing three wind measurement systems in the area where the farm is located and which have recorded the wind power potential in the area during the last two years.

    Saint Brieuc will also have Spanish involvement since its 62 jackets, the structures that support offshore wind turbines, and their corresponding piling will be entirely built by Navantia-Windar in Fene in Coruña and Avilés in Asturias, respectively. The final assembly of all component parts will be completed at the Galician shipyard facilities.

    The Dutch marine contractor Van Oord has been selected to transport and install the 62 jacket foundations and offshore substation. Van Oord will start the offshore operations in 2021 with the installation of the pin piles and the offshore substation. To do so, it will deploy its offshore installation vessel Aeolus, which was purposely built to construct offshore wind parks. The Aeolus will be assisted by a second vessel in 2022.

    Siemens Gamesa Renewable Energy will be making the turbines for the wind farm, 207 metres high each. They will be equipped with state-of-the-art direct drive technology and their blades, measuring almost 82 metres in length, will deliver a swept area that is 18 % larger than the previous model along with 20 % higher annual power production compared to their predecessor. The Saint-Brieuc wind turbines will be built in France, at Siemens Gamesa Renewable Energy's bespoke industrial facility, located in the port of Le Havre, where blades, nacelles and generators will be fabricated.

    On the other hand, submarine connection cabling systems will be provided by Prysmian Group. Prysmian will install and commission 90 km of 66 kV alternating current high.voltage connection cabling and three XLPE insulation hubs. The cable hubs will be manufactured at the group's centres of excellence in Montereau-Fault-Yonne and Gron in France and will be assembled and finished in Nordenham in Germany, providing the French market with locally produced, state-of-the-art Prysmian cabling. The system is expected to be up and running by the end of 2022.

    Source : Strategic Research Institute
  8. forum rang 10 voda 7 juli 2020 14:20
    RWE Renewables Gwynt y Môr Extension Announces Project Partners

    RWE Renewables UK has announced the new partners and name of the Gwynt y Môr Offshore Wind Farm extension project and confirmed Agreement for Lease has successfully been secured with The Crown Estate. The Gwynt y Môr extension project, which is currently in the early stages of development, will be known as Awel y Môr Offshore Wind Farm, meaning Sea Breeze. The project partners are now confirmed and include RWE 60%, Stadtwerke München 30% and Siemens’ financing arm, Siemens Financial Services 10%. RWE, is once again leading the development of the project on behalf of the project partners.

    Awel y Môr Offshore Wind Farm has also secured an Agreement for Lease with The Crown Estate for an area of seabed around 106km2 to the west of the existing Gwynt y Môr Wind Farm.

    The existing Gwynt y Môr Wind Farm was officially inaugurated in 2015 with the 576MW project able to generate enough energy for approximately 400,000 homes per annum and supporting over 100 permanent, skilled jobs in North Wales.

    Source : Strategic Research Institute
  9. forum rang 10 voda 9 juli 2020 15:39
    GWEC Launches Task Force to Drive Global Growth of Floating Offshore Wind

    The Global Wind Energy Council has announced the formation of a Floating Offshore Wind Task Force with participation of key global industry players and associations to drive global growth of floating offshore wind. The Floating Offshore Wind Task Force will be chaired by GWEC Global Offshore Wind Ambassador and industry pioneer Henrik Stiesdal, and Vice-Chaired by Maf Smith, floating offshore wind expert and former Deputy CEO of RenewableUK. Members of the Task Force consist of leading stakeholders in the floating offshore wind sector, including: Equinor, GE Renewable Energy, Iberdrola, Ideol, the Japanese Wind Power Association, MHI Vestas, Ørsted, Principle Power, RenewableUK, Siemens Gamesa Renewable Energy, Shell, Stiesdal, wpd, and The World Bank Group.

    The first actions of the Task Force will be to define the priority markets for offshore wind, and engage with the relevant local associations, policymakers and NGOs in the fishing, marine mammals and ports sectors through a sequence of conferences, seminars and workshops to promote and educate stakeholders about the floating offshore sector and to share best practices.

    Floating offshore wind is a significant market opportunity, and can increase offshore wind resource by tenfold by opening new markets where fixed-bottom offshore wind would not be possible. As of the end of 2019, 65.7 megawatts of floating offshore wind capacity was installed globally, in the UK, Japan, Portugal, Norway and France. According to GWEC Market Intelligence forecasts, 6.2 gigawatts of floating offshore wind is likely to be built by 2030 given the current project pipeline. However, this forecast could be increased to up to 19 gigawatts if cost reduction is accelerated.

    Source : Strategic Research Institute
  10. forum rang 10 voda 10 juli 2020 15:29
    Arcadis Ost 1 Monopile Foundation Contract Awarded to Steelwind

    In the presence of Lower Saxony’s Minister for Environment and Energy, Olaf Lies, Parkwind and Steelwind have signed a contract for the fabrication of the monopile foundations for the Arcadis Ost 1 offshore wind farm on July 3rd, at Steelwind HQ in Nordenham in Germany. This signature follows the recently announced OSS contract with Bladt and further secures Parkwind’s planning for the project. As one of the key market players in monopile fabrication, Steelwind will deliver 27 WTG and one OSS next generation XXL-Monopile units.

    The monopile production starts 2021. Europe's leading producer of heavy plate Dillinger will supply the heavy steel plates for the monopiles.

    The Arcadis Ost 1 wind farm has a capacity of about 247 MW and is located in the Baltic Sea, northeast of the island of Rügen, within the 12-nautical mile zone of the Federal State Mecklenburg-Western Pomerania, Germany. In April 2018, Parkwind was successful in the offshore wind auction in Germany, launched by the Federal Grid Agency.

    Steelwind Nordenham GmbH, a Dillinger Group company, has been manufacturing monopiles and transition pieces in Nordenham since 2015, and now also produces “single-piece” monopile foundations with unit weights of up to 2,400 metric tons. The single-piece monopile foundation replaces the previous design with a separate monopile and transition piece by integrating certain parts of the transition piece into the monopile. The monopile can then be up to 120 meters long. The steel for the foundations comes from Dillinger – the European heavy plate market leader located in Saarland.

    Source : Strategic Research Institute
  11. Joni-2 13 juli 2020 13:01
    Greenalia heeft een bouwvergunning aangevraagd voor de bouw van een 50 MW drijvend windpark, bij Gran Canaria, nabij de haven van Arinaga.

    Ook Equinor heeft een 200 MW drijvend windpark, nabij de Canarische eilanden, voorzien voor 2024....

    Equinor heeft momenteel het enige operationele drijvende windpark in Schotland.

    www.theolivepress.es/spain-news/2020/...

    cleantechnica.com/2019/07/16/equinor-...

    www.equinor.com/en/what-we-do/floatin...
  12. forum rang 10 voda 14 juli 2020 15:43
    RWE Chooses GE Renewable Energy’s Grid Solutions & Sembcorp Marine for Sofia Offshore Wind Farm Electrical Transmission System

    RWE has moved a step closer to the realisation of its 1.4 gigawatt Sofia Offshore Wind Farm with the selection of the preferred suppliers for the project’s high voltage direct current transmission system. A specially formed consortium of GE Renewable Energy’s Grid Solutions and Sembcorp Marine is set to supply the state-of-the-art system for Sofia, one of the world’s largest offshore wind farm projects, located on Dogger Bank, the shallow area of the central North Sea, 195 kilometres from the UK coast’s nearest point. As the consortium leader, GE’s Grid Solutions will be responsible for the engineering, procurement, construction and installation of two HVDC converter stations capable of transmitting 1,400 megawatts of power at 320 kilovolts. Innovative converter modules and a new high-tech control system have been deployed for Sofia. It will be the most powerful offshore converter station ever fabricated and will be installed at a point 220 kilometres from shore, so will also be the most remote.

    The offshore converter platform will be built and installed by Sembcorp Marine. At the heart of the wind farm, it will comprise 10,000 tonnes topside attached to a jacket foundation piled into the seabed. The onshore converter station will convert the electricity generated by the wind farm to 400 kV, before it enters the national grid.

    GE’s Grid Solutions and Sembcorp Marine are starting early design works in July, with the full contract subject to the project’s final investment decision, due in the first quarter of 2021. The HVDC transmission system represents Sofia’s second largest contract and will include the design, manufacture, installation, commissioning and maintenance of the offshore converter platform and the onshore converter station, including all ancillary equipment.

    Construction of the wind farm is due to begin onshore at its Teesside converter station site early next year, with offshore construction expected to get underway in 2023. The HVDC transmission system news follows the announcement that Sofia has signed a preferred supplier agreement with Siemens Gamesa Renewable Energy for 100 of its SG 14-222 DD offshore wind turbines, a 14MW design that is 25 percent more powerful than its next largest model.

    With an installed capacity of more than 9.5 GW RWE is UK's second largest generator of electricity. Via its subsidiary, RWE Renewables, the company has significant experience in the British offshore market with nine wind farms in operation off the UK coast and Triton Knoll Offshore Wind Farm 857 MW currently under construction. Further offshore development projects, like Sofia, 100% owned by RWE, underline the growth ambitions of the company in this country.

    Source : Strategic Research Institute
  13. forum rang 10 voda 14 juli 2020 16:08
    Vestas Secures Service Agreement for Senvion Turbines in Croatia

    Leveraging industry-leading multibrand service capabilities, Vestas has secured a service agreement for the Croatian wind energy project Orjak in northern Croatia from VJETROELEKTRANA ORJAK d.o.o., a daughter company of ECOwind Handels-und Wartungs-GmbH, which is a subsidiary of global renewable energy developer BayWa r.e. Vestas will deliver the maintenance of the project’s five Senvion MM92-2.05 wind turbines and the 18-year Active Output Management 4000 service agreement will commence immediately.

    Vestas is the wind industry’s largest multibrand service provider with more than 8 GW of non-Vestas turbines currently under service globally. Vestas’ multibrand expertise and global footprint is being utilised to deliver full scope service across all major Senvion platforms, including the MM82-2.05MW, MM92-2.05, 3.XM EBC and 3.XM NES platforms.

    Source : Strategic Research Institute
  14. forum rang 10 voda 14 juli 2020 16:10
    BAM en Strukton bouwen hoogspanningslijn voor Tennet

    (ABM FN-Dow Jones) BAM Infra gaat samen met een consortium van Mobilis en Strukton de hoogspanningsverbinding tussen de stations Borssele en Rilland aanleggen. Dat maakte het bouwbedrijf dinsdag bekend zonder financiële details te verstrekken.

    De opdracht van netwerkbeheerder Tennet is in twee gelijke delen verdeeld tussen BAM en het consortium: BAM doet het westelijke traject van Borssele tot Willem-Annapolder, het andere deel is voor Mobilis en Strukton. De aanleg start na de zomer.

    De bouwers maken over een afstand van 48 kilometer mastfundaties voor de hoogspanningsmasten, leggen wegen en werkterreinen aan en herstellen de gronden naderhand. Er zijn 107 mastlocaties waar twee wintrackmasten worden neergezet, plus twee hogere vakwerkmasten bij een kanaal. Na afronding van het project kunnen 131 andere hoogspanningsmasten in Zuid-Beveland en bij Rilland verdwijnen.

    De hoogspanningslijnen vergroten de capaciteit omdat de huidige verbinding vol is. Bovendien moet de stroom die straks van windparken voor de Zeeuwse kust komt via Borssele over het Nederlandse stroomnet worden verdeeld.

    Door: ABM Financial News.
    info@abmfn.nl
    Redactie: +31(0)20 26 28 999

    © Copyright ABM Financial News B.V. All rights reserved.
  15. forum rang 10 voda 20 juli 2020 15:43
    Siemens Gamesa and Trianel Windpark Borkum II celebrate new milestone with offshore service contract for Senvion wind turbines

    Image Source: Siemens Gamesa Trianel Windpark Borkum II

    Siemens Gamesa Renewable Energy will service Germany’s newest offshore wind park Trianel Windpark Borkum II. The installation of the 32 Senvion 6.33 megawatt turbines was completed in May 2020. TWB II has a total output capacity of 200 megawatts and produces clean energy for around 200,000 households per year. It is located 45 kilometers north of Borkum. The wind park is owned by 20 municipal utilities and municipal companies from Germany and Switzerland.

    The contract signed late in June marks a double premiere. It is the first time for Siemens Gamesa to win an offshore service contract for a wind park equipped by another manufacturer and the first time Siemens Gamesa will start servicing Senvion offshore turbines since the acquisition of the onshore service business of Senvion in Europe and its intellectual property in January 2020. Since then, the company has been awarded a number of additional onshore service contracts for Senvion turbines due to its comprehensive knowledge and expertise in servicing Senvion technology. Now the first offshore contract is added to the Siemens Gamesa service fleet.

    The maintenance will start on August 1, 2020. It covers full scope service for five years and includes fixed extension options. The operational base for the service campaigns will be Borkum.

    Source : Strategic Research Institute
  16. forum rang 10 voda 20 juli 2020 15:46
    Approval of Shetland Transmission Link Unlocks GBP 1 Billion of Investment

    SSE plc has welcomed decision by Ofgem to approve the 600 megawatt HVDC transmission link connecting Shetland to the GB mainland. The link, being taken forward by SSE’s transmission business, Scottish and Southern Electricity Networks Transmission, will facilitate the connection of renewable electricity developments on Shetland, including SSE Renewables’ 443 megawatt Viking wind farm which reached a final investment decision in June 2020. The link will also support Shetland’s future security of supply needs and will connect Shetland to the main GB electricity system for the first time and represents a material cost saving for consumers.

    Approval is conditional on Ofgem being satisfied, by the end of 2020, that Viking wind farm is likely to go ahead. SSE Renewables is engaging with Ofgem to provide satisfactory evidence as set out in the needs case consultation.

    These investments in renewables and electricity networks form part of SSE’s GBP 7.5 billion low carbon investment programme over the next 5 years which it announced in June. With all necessary regulatory and planning approvals now in place, construction of the subsea link, all associated onshore transmission infrastructure and Viking wind farm will scale up in the coming weeks, providing an immediate boost to the green recovery from the coronavirus pandemic and supporting the UK and Scotland’s commitments to net zero emissions by 2050 and 2045 respectively.

    Source : Strategic Research Institute
  17. forum rang 10 voda 21 juli 2020 11:16
    Vestas Bags Wind Turbine Order from Polenergia Farma Wiatrowa 3 Sp in Poland

    Vestas has developed a customised wind energy solution for long-term customer Polenergia Farma Wiatrowa 3 Sp zoo to secure a 121 megawatt wind project in Poland from a competitive auction round. Together with Vestas’ previously announced orders from Poland’s technology-neutral energy auctions, this auction win showcases onshore wind energy’s competitiveness and underlines Vestas’ market leadership in the country. The Zielona Debsk project with a total capacity of 121 megawat will be located in north-central Poland in the Mazovian Province.

    The site-specific solution comprises 55 V110-2.0 megawat turbines in 2.2 megawat Power Optimised Mode on 120m towers and a long-term service agreement, leveraging the flexibility of the 2 MW platform to cater for local requirements and maximise the power production while lowering the levelised cost of energy.

    The project will feature a VestasOnline® Business SCADA solution, lowering turbine downtime and thus optimising the energy output. The contract further includes supply, installation and commissioning of the wind turbines, as well as 30-year Active Output Management 5000 service agreements.Deliveries are expected to begin in the third quarter of 2021, while commissioning is planned to start in the fourth quarter of 2021.

    Source : Strategic Research Institute
  18. forum rang 10 voda 23 juli 2020 15:17
    EDP Renováveis & ENGIE form Ocean Winds

    ENGIE and EDP Renováveis have announced the creation of Ocean Winds, a joint venture equally controlled by both companies in the floating and fixed offshore wind energy sector. The new company will act as the exclusive investment vehicle to capture marine wind energy opportunities around the world and will become one of the top five offshore global operators by combining the industrial and development capacity of both parent companies.

    Spyros Martinis, CEO of OW, explained: “OW has been created with the intention of combining the experience and knowledge of two companies with a successful track record in the generation of renewable energy under one single firm, in order to take a leading position in the marine wind sector. We share a vision for the key role of renewables in general, and offshore in particular, in the new energy model. The creation of a company combining the experience and resources of both will give us the chance to lead a sector in this increasingly real and necessary transition.”

    Grzegorz Gorski, COO of OW, added: “We are continuously monitoring the evolution and regulation of multiple countries. We are seeking not just to grow in the markets where we are already present, but also to explore opportunities to add value in new countries.”

    OW has over 200 employees and expects to reach 300 towards the end of the year. This remarkable human team will represent over fifteen different nationalities, including highly qualified staff, almost a third of them women and 99% with fixed employment contracts.

    The first brand created using the sound of the wind on the high seas

    The origin of the OW brand is no coincidence. When ENGIE and EDPR were looking for a name for the new business they brought in a team of scientists who could help to identify the sound of the wind in the Roman alphabet. They developed a specific algorithm and equipment to transcribe into letters the sound of the wind recorded offshore over a 48-hour period. The two most commonly occurring letters were “O” and “W”, thus giving rise to the name Ocean Winds. You can find out more about OW’s brand creation process in this video:

    Ocean Winds is born, the new company specialized in offshore wind power called to become a global leader.

    Source : STRATEGIC RESEARCH INSTITUTE
2.053 Posts
Pagina: «« 1 ... 62 63 64 65 66 ... 103 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Indices

AEX 874,79 +0,96%
EUR/USD 1,0713 +0,10%
FTSE 100 8.044,81 +0,26%
Germany40^ 18.161,70 +0,13%
Gold spot 2.319,72 -0,10%
NY-Nasdaq Composite 15.696,64 +1,59%

Stijgers

VIVORY...
+26,32%
BAM
+4,73%
PROSUS
+3,52%
ASMI
+3,14%
JUST E...
+3,10%

Dalers

RANDST...
-7,22%
Akzo N...
-6,93%
FASTNED
-4,65%
NSI
-3,89%
Arcelo...
-2,65%

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites