Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel BAM Groep Koninklijke AEX:BAMNB.NL, NL0000337319

  • 3,820 23 apr 2024 10:35
  • +0,014 (+0,37%) Dagrange 3,790 - 3,834
  • 59.359 Gem. (3M) 1,4M

BAM maart 2020

3.942 Posts
Pagina: «« 1 ... 192 193 194 195 196 ... 198 »» | Laatste | Omlaag ↓
  1. forum rang 7 boldie 31 maart 2020 10:50
    quote:

    €d_Modus Vivendi schreef op 31 maart 2020 10:47:

    [...]anders dan door ING bepaald. Ik heb toch echt sch88t aan die analisten.
    Het gaat om feiten en die kan niemand geven.
    simpel. Tekst omschrijft verstandig besluit. Bij andere aandelen resulteert dus als opluchting en dikke plussen van 6 tot 8% up. Maar zoals aker bij bam zorgen de shorters er wel voor dat de opluchting rally weer kop wordt ingedrukt. Blijf erbij opknippen die zooi
  2. snipper 31 maart 2020 11:43
    ...maakt voor Bam niet veel uit, een crisis erbij, het ging toch al bar slecht, dividend al verlagen van €0,14 naar €0,02 is al een zeer slecht teken in gewezen hoogconjuctuur, en nu niks. Gewoon alle bouw aandelen van de beurs afhalen, ze bakken er al 17jaar nix van, sinds de bouwfraude. Deze bus heeft zijn laatste rit gemaakt mi.
  3. Crockett 31 maart 2020 11:55
    quote:

    marcel13 schreef op 31 maart 2020 11:47:

    [...]

    En ing geeft koersdoel € 2,60 = koersverdubbeling.
    T gaat erom wanneer koersdoel wordt afgeven en waar die bank zelf heen wil
    ik zou zeggen, als coronasituatie achter rug is, en zelfs stikstof en PFAS nieuws positief kan zijn, gaan we eerder richting 3E weer
  4. forum rang 4 Marinus-86 31 maart 2020 12:12
    quote:

    snipper schreef op 31 maart 2020 11:43:

    ...maakt voor Bam niet veel uit, een crisis erbij, het ging toch al bar slecht, dividend al verlagen van €0,14 naar €0,02 is al een zeer slecht teken in gewezen hoogconjuctuur, en nu niks. Gewoon alle bouw aandelen van de beurs afhalen, ze bakken er al 17jaar nix van, sinds de bouwfraude. Deze bus heeft zijn laatste rit gemaakt mi.
    Zijn je snipperdagen al op ?
  5. forum rang 6 €d_Modus Vivendi 31 maart 2020 12:36

    News
    Interserve and Bam among firms building emergency covid-19 hospitals

    By Tom Lowe31 March 2020

    No comments
    Save article

    Vinci and Midas Group also setting up new wards across UK

    Interserve, Bam and Vinci are among the firms building a series of emergency hospitals across the UK to care for covid-19 patients.

    The health department has revealed plans to build the NHS “Nightingale” wards in London, Birmingham, Manchester, Cardiff, Glasgow and Belfast.

    Interserve have confirmed they are building the Birmingham ward, which will be housed within the 190,000m2 NEC centre.

    A spokesperson for Interserve said: “Interserve Construction has been commissioned by the UK government to convert the Birmingham National Exhibition Centre into a Nightingale Hospital facility to treat covid-19 patients.

    coronavirus

    “As the principal contractor Interserve will be responsible for creating clinical space for 600 beds with further phases to accommodate 4,000 beds in total. Interserve will also build a drive-through covid-19 testing centre.”
    >> Search under way for contractors to help out NHS
    >> Coronavirus crisis delays health department’s new £20bn framework
    >> Webinar available on demand now: Covid-19’s impact on construction - the legal view

    Building understands Vinci are the firm building the Manchester ward in the Manchester Central Convention Complex, while Bam yesterday said they were mobilisng to build two emergency wards - -though did not confirm where.

    A spokesperson for Bam told Building yesterday that work on the two new wards was underway and they will be up and running by the end of the week.

    The department of health said the network of new facilities has been procured through the p22 framework in England, which also includes Kier, Galliford Try and IHP, a JV between Vinvi and Robert McAlpine.

    The framework was originally meant to run out this year but has been extended by up to 12 months to help support the NHS through the coronavirus pandemic.

    Meanwhile, Midas Group has confirmed they are among the contractors building the London ward in the 100,000m2 ExCel centre near London City Airport.

    The new hospital, which was first announced seven days ago, will open this week and contain at least 4,000 beds.
3.942 Posts
Pagina: «« 1 ... 192 193 194 195 196 ... 198 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

BAM: sterk slotkwartaal opsteker voor nieuwe strategie

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links