Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Windpower - Europe

2.053 Posts
Pagina: «« 1 ... 24 25 26 27 28 ... 103 »» | Laatste | Omlaag ↓
  1. forum rang 10 voda 26 mei 2017 15:33
    quote:

    Bowski schreef op 25 mei 2017 10:37:

    Hoe meer windmolens, hoe meer CO2 uitstoot.

    Stijging CO2-uitstoot

    De totale CO2-uitstoot in Nederland steeg in 2016 met 2,7 procent. Volgens WISE is dat te verklaren omdat de grote stroomleveranciers simpelweg meer stroom zijn gaan leveren.
    radar.avrotros.nl/nieuws/detail/meer-...
    Een bijzonder vreemd artikel!

    Een aantal zaken in dit artikel spreekt elkaar juist tegen.

    Er is juist meer groene stroom bijgekomen, dit gaat juist gepaard met minder CO2 uitstoot.

    Volgens mij, is door decentrale opwekking, het verbruik eerder afgenomen, dan toegenomen.
    Als ik naar mijzelf kijk, ik had vorig jaar, in 2016, ongeveer 2600 kWh stroom verbruikt. Mijn zonnepanelen wekten in dat jaar ook zoiets op. Mijn netto verbruik, derhalve, was maar 10 kWh, voor een heel jaar!
  2. forum rang 10 voda 26 mei 2017 18:15
    quote:

    Bowski schreef op 26 mei 2017 18:00:

    @Voda
    Wat de verklaring precies is weet ik niet.
    Maar die stroom die jij opwekt moet ergens anders naar toe en de stroom die je nodig hebt komt ergens anders vandaan.
    Dat kost energie.
    Dat jij saldeert over een heel jaar verhult het feitelijk verbruik van je gesubsidieerde systeem.
    Bowski, met die laatste zin ben ik het ABSOLUUT oneens met je.

    Ten eerste heb ik die panelen zonder subsidie gekocht, die bestaat feitelijk voor particulieren niet eens meer.

    Ten tweede, een overschot aan enegie stroomt gewoonweg naar mijn buren. Geen energie verlies dus met transport.

    Ten derde, ik betaal net zo als iedere Nederlander die op het Net aangesloten is, Netbeheer kosten! Zelfs als je een netto leverancier bent, betaal je deze kosten steeds.

    Het is de taak aan de Netbeheerder om jaarlijks onderhoud en uitbreiding te doen.

    Conclusie: er is geen gesubsidieerd systeem.

  3. [verwijderd] 26 mei 2017 18:29
    Kom op Voda, in een kWh zit voor €0,04 aan energie en je saldeert met belasting en alles a €0,20.
    En om jou in donkere dagen/nachten van stroom te voorzien moeten ze hele gas- en kolencentrales om de haverklap opstarten en daarna weer laten afkoelen omdat jij weer met je Wattjes aan komt zetten. Wat denk je wat dat wel niet kost aan energie?
    Zou je die centrales altijd aan kunnen laten staan dan bespaar je heel wat calorietjes (=CO2).
  4. forum rang 10 voda 26 mei 2017 19:38
    quote:

    Bowski schreef op 26 mei 2017 18:29:

    Kom op Voda, in een kWh zit voor €0,04 aan energie en je saldeert met belasting en alles a €0,20.
    En om jou in donkere dagen/nachten van stroom te voorzien moeten ze hele gas- en kolencentrales om de haverklap opstarten en daarna weer laten afkoelen omdat jij weer met je Wattjes aan komt zetten. Wat denk je wat dat wel niet kost aan energie?
    Zou je die centrales altijd aan kunnen laten staan dan bespaar je heel wat calorietjes (=CO2).
    Sorry Bowski, ik had je veel hoger zitten!
    Mijn hemel, nu zit je appels met peren (die 4 en 20 cent) te vergelijken!

    Nu ga je allerlei rijks - en provinciale lasten er bij sleuren, voor wat?
    Enne , enig idee wat die zonne panelen in de winter doen? Weinig, heel erg weinig!

    Hoezo moeten die centrales om de haverklap opstarten?
    Windenenergie daar en tegen zit hier niet mee! Ga mij, en overige zonne paneelhouders, niet met een drogreden opzadelen!
    BTW, als ik jouw zin moet geloven, zou er eigenlijk dus helemaal geen groene energie moeten zijn!!

    Kunnen lekker al die kolen- en gas gestookte centrales lekker "regelmatig" CO2 uitstoten.
  5. forum rang 10 voda 27 mei 2017 16:48
    Ik heb ook mee gedaan aan deze nieuwe vorm van energie opwekken.

    Windenergie van toekomst
    24 MEI 2017
    Gabi Ouwerkerk

    Den Haag - Energieopwekkende vliegtuigjes kunnen een einde maken aan de kolossale windmolenparken die menig uitzicht ontsieren. Het Nederlandse bedrijf Ampyx Power werkt aan zijn laatste prototype en verwacht binnen vijf jaar de eerste windmolens te hebben vervangen.

    De vliegtuigen met een spanwijdte van zo’n 28 meter kunnen circa tweeduizend huishoudens van stroom voorzien. Daarmee zijn ze even effectief als de oude 2 megawatt (MW) windturbines. Hoewel de huidige windturbines 8 MW zijn, weegt deze kracht volgens Ampyx Power-oprichter Richard Ruiterkamp niet op tegen de voordelen van het Airborne Wind Energy systeem.

    „Onze vliegtuigen vliegen op een hoogte van 450 meter. Dat is hoger dan windturbines die op circa 200 meter actief zijn. In hogere luchtstroming is de afremming van de wind minder groot, waardoor onze technologie veel verder landinwaarts toegepast kan worden. Dat biedt mogelijkheden voor landen die geen watermassa hebben.”

    Het bedrijf doet ook onderzoek naar drijvende systemen. Het materiaalgebruik is ruim 90% minder dan huidige windturbines en dat maakt het mogelijk de systemen op drijvers te plaatsen waardoor verder uit de kust, in diepere wateren, energie opgewekt kan worden. Op zo’n diepte is het plaatsen van palen te kostbaar.

    Het idee om windenergie op te wekken met een vlieger is afkomstig van de in 2014 overleden ruimtevaarder Wubbo Ockels. Ruiterkamp werkte als universitair docent aan de TU Delft met hem samen. Hoewel het toestel vrijwel een volwaardig vliegtuig is, zit het net als een vlieger vast aan een kabel.

    Bij voldoende wind vliegt de drone achtjes in de lucht. De wind die het daarbij oogst zet het om in trekkracht in de lier waar 600 meter kabel aan vastzit. De lier gaat daardoor draaien en drijft de generator aan waarin de energie wordt opgewekt. Op windstille momenten blijft het vliegtuig op zijn platform staan en is er vrij uitzicht aan de horizon. Al wijst Ruiterkamp erop dat door de vliegsnelheid van 300 kilometer per uur ook een actief vliegtuig nauwelijks zichtbaar is.

    De stroomvliegtuigen moeten aan vrijwel dezelfde veiligheidseisen voldoen als reguliere vliegtuigen. Wel wijkt het ontwerp af. „Ons vliegtuig heeft een andere functie. We hebben de romp niet nodig voor het vervoer van mensen of vracht en houden die zo kort mogelijk. Het vleugeloppervlak is wel belangrijk. We streven naar 60 tot 70 m2.”

    Het Duitse energiebedrijf E.ON is afgelopen april een samenwerking aangegaan met Ampyx Power. Samen gaan ze volgend jaar op een locatie in Ierland het laatste prototype testen, in 2020 volgt het eerste commerciële 2 MW systeem. Als dit succesvol verloopt, wil E.ON de technologie gebruiken als vervanging van zijn offshore windparken.

    „Nieuwe windturbines zijn veel groter en zwaarder dan de oude modellen die nu aan vervanging toe zijn”, vertelt Wolbert Allaart, directeur van Ampyx Power. „Het is daardoor niet mogelijk ze op de oude fundering te zetten. Ons systeem wel. Vandaar ook de grote belangstelling van E.ON.”

    Ook onder burgers is de interesse groot. Sinds 2013 hebben zo’n 600 mensen via crowdfunding gezamenlijk een bedrag van ruim €5 miljoen in het bedrijf geïnvesteerd. „Ons bedrijf is voor ruim 20% in handen van de crowd”, vertelt Allaart. Voor de bouw van het laatste prototype loopt tot 28 mei een crowdfundingcampagne.

    www.telegraaf.nl/dft/tech/28228337/__...
  6. forum rang 10 voda 8 juni 2017 20:04
    F2i acquire Sicilian and Calabrian wind farms in green drive in Italy

    Reuters quoted F2i, the largest infrastructure fund operating in Italy as saying that it will strengthen its position in green energy by buying seven wind farms in the south of the country. The fund, which is around 14 percent owned by state lender Cassa Depositi e Prestiti, said it had bought the wind plants on the island of Sicily and in Calabria from Italy's Veronagest. It did not disclose the price for the 282 megawatt wind power portfolio, but in a joint statement with Veronagest it said the deal is expected to be wrapped up by the end of June.

    F2i, which owns 70 percent of green energy company e2i alongside France's EDF, has an overall wind power capacity of more than 1,000 MW.

    Source : Reuters
  7. forum rang 10 voda 19 juni 2017 16:25
    'Definitief contract windpark goed voor Sif'

    Gepubliceerd op 19 jun 2017 om 10:26 | Views: 819

    Sif Holding 16:06
    19,67 +0,67 (+3,50%)

    AMSTERDAM (AFN) - De opdracht die Sif maandagochtend bekendmaakte is goed nieuws, maar kan niet echt een verrassing worden genoemd. De specialist in offshorefunderingen had de klus eerder al opgenomen in een lijst van contracten waarover exclusief werd onderhandeld, schrijft analist Tijs Hollestelle van ING maandag in een commentaar.

    Sif levert onder meer de palen waarop het Albatros-windmolenpark in het Duitse deel van de Noordzee wordt gebouwd. Hoeveel de klus oplevert, is niet bekendgemaakt. ING gaat er van uit dat het bedrijf nog meer opdrachten voor 2018 in de wacht kan slepen, gezien de gezonde vooruitzichten op de markt voor windenergie op zee.

    Hollestelle heeft een koopadvies staan met een koersdoel van 22,25 euro. Het aandeel Sif steeg maandagochtend 2,2 procent tot 19,42 euro.
  8. forum rang 10 voda 22 juni 2017 21:41
    Northumberland wind farm hits full power

    Vattenfall’s 54.4MW Ray Wind Farm, in the north east of England, is fully operational, the Swedish energy company said today. 

    The 16 wind turbines will produce on average every year enough fossil-fuel free power to meet the equivalent annual demand of over 30,000 UK households. 

    Ray Wind Farm, a Vattenfall investment of around £90million, is located on the Ray Estate, near Kirkwhelpington in Northumberland. It is the second Vattenfall UK wind farm to be finished in recent weeks. In early May, Pen y Cymoedd in Wales produced power from all 76 turbines. 

    Gunnar Groebler, Vattenfall’s Head of Business Area Wind, said: “Vattenfall continues to grow its wind business in the UK with Ray Wind Farm now fully operational, just a few weeks after its bigger sister – Pen y Cymoedd – hit the same target. I would like to congratulate Vattenfall colleagues and contractors for a job safely done, on time and to budget.” 

    Reflecting on the UK General Election, Gunnar added: “We have been encouraged by cross party support for determined action on climate change in the General Election. We’re convinced that onshore wind can and will help keep energy bills down for consumers and businesses, whilst driving clean economic growth.? That is why we continue to develop good projects in the UK.” 

    Construction on Ray Wind Farm commenced at the end of July 2015 with Scottish civil engineering firm RJ McLeod’s preparing the site for 16 Senvion 3.4M104 wind turbines.

    corporate.vattenfall.co.uk/about-vatt...
  9. forum rang 10 voda 3 juli 2017 17:24
    Surging renewables output weighs on European spot power prices - Report

    Reuters reported that European spot electricity prices for day-ahead delivery tumbled on Thursday, impacted by a forecast surge in power generation from renewable wind and solar sources, while demand is also expected to fall. The baseload German spot power for Friday delivery fell by EUR 6.1, or over 16 percent, to EUR 31.10 per megawatt-hour. The equivalent French contract slipped 4.25 euros, or 11.33 percent, to 33.25 euros/MWh.

    Electricity production from German wind turbines is expected to rise by nearly 9 gigawatts day-on-day on Friday to 14.6 GW, according to Thomson Reuters data. Solar power generation will rise by 2.3 GW to 6.2 GW, during the same period.

    Source : Reuters
  10. forum rang 10 voda 6 juli 2017 16:37
    Siemens Gamesa levert windmolens Zeeuws park

    Gepubliceerd op 6 jul 2017 om 08:17 | Views: 696

    Siemens 05 jul
    122,30 +0,50 (+0,41%)

    ZAMUDIO (AFN) - Siemens Gamesa gaat 94 windmolens leveren aan DONG Energy voor twee windmolenparken voor de Zeeuwse kust. Financiële details zijn niet bekendgemaakt.

    De 94 turbines van 8 megawatt, zijn samen goed voor het opwekken van 752 megawatt aan stroom. Dat is voldoende voor 1 miljoen huishoudens.

    De windmolens komen in de windparken Borssele 1 en 2 te staan. Die parken worden 22 kilometer voor de Zeeuwse kust gebouwd en moeten in 2020 in gebruik worden genomen. Siemens Gamesa gaat ook het onderhoud van de windmolens verzorgen.
  11. forum rang 10 voda 24 juli 2017 16:17
    Mammoet finishes transport for Clyde Wind Farm extension in Scotland

    Mammoet delivered the last wind turbine components for the extension of the Clyde Wind Farm situated near Abbington, Scotland. Energy supplier SSE is currently extending the existing 152 turbine wind farm with an additional 54 turbines. Mammoet was responsible for the transportation of all the turbine components during the construction of the extension that will be finished later this year.

    Source : Strategic Research Institute
  12. forum rang 10 voda 24 juli 2017 16:18
    Scottish USD 2.6 billion wind power project gets go-ahead

    Reuters reported that the developer of a USD 2.6 billion Scottish offshore wind power project said it had won a two-year court battle with a bird charity over plans for the site. Scottish ministers in 2014 approved plans to build the 450-megawatt Neart na Gaoithe wind farm, off Scotland's east coast. The project had been held up, however, by a legal challenge from the Royal Society for the Protection of Birds, which said it could cause the death of hundreds of native birds.

    Mainstream Renewable Power, the developer, said the decision in Scotland's Court of Session cleared the way for the project, which could generate enough electricity to power up to 325,000 homes - almost 4 percent of Scotland's electricity demand.

    Mr Andy Kinsella, Mainstream Power's chief operating officer, said in a statement that "We are delighted with the decision and look forward to working constructively with the RSPB to take the wind farm into construction next year."

    Source : Reuters
  13. forum rang 10 voda 26 juli 2017 20:47
    World's first FLOATING wind farm is taking shape in Scotland - Report

    Daily Mail reported that giant turbines are on the move to Scotland to create the world's first full-scale floating wind farm. New technology enables the structures to float in water which is too deep for conventional offshore wind farms. The first of the 11,500-tonne turbines has been put in place at the Hywind development at Buchan Deep, 15 miles (25km) off the north-east coast at Peterhead.

    The turbine was towed across from Norway, where four more are waiting to be brought over for the trial scheme which is expected to power about 20,000 homes.

    The first of the 11,500-tonne turbines has been put in place at the Hywind development at Buchan Deep, which lies 15 miles (25km) off the north-east coast at Peterhead, Aberdeenshire. The device was towed across from Norway, where four more are waiting to be brought over for the trial scheme which is expected to power about 20,000 homes.

    However, a total of five floating 6MW turbines will be tethered to the bottom of the seabed in deeper water than any other development around the coast of the UK.

    Developed by the Norwegian company Statoil, the project has cost GBP 200 million. These turbines - each one larger than the London Eye and able to create 6MW - use a ballast of iron ore to operate in far deeper waters than has been previously possible.

    Announcing the decision to invest in the project previously, manufacturer Statoil said in a statement it marks 'an important step forward for offshore wind technology and potentially opens attractive new markets for renewable energy production worldwide'.

    Source : Daily Mail
  14. forum rang 10 voda 28 juli 2017 21:23
    Mr Alexander Shokhin calls Siemens turbines scandal high-cost mistake

    Mr Alexander Shokhin, Russian Union of Industrialists and Enterpreneurs head said that the scandal surrounding the Siemens turbines that were allegedly moved from mainland Russia to Crimea against the terms of the company's supply contract is a high-cost mistake that hampers Russia-EU relations.

    Earlier this month, Siemens decided to annul a power plant supply license agreement and suspend power equipment deliveries to Russian state firms after the company learned that at least two of the four gas turbines provided for a project in southern Russia's Taman had been allegedly moved to Crimea, where Russia was building two thermal plants.

    Mr Alexander Shokhin, RSPP head said that "Sure, we cannot repeat the mistakes like the one with the turbines in Crimea. If the contract really provided definite localization, then these mistakes, and let us call them mistakes, come at a dear cost and affect the European Union's opinion on us [Russian businesses] observing or not observing agreements."

    Mr Shokhin said that the situation called for a scrupulous approach, based on a thorough fulfilment of the contract's provisions.

    He said that "Since, if I'm not mistaken, the turbines were produced in 2015 [after the European Union imposed anti-Russia sanctions], despite the willingness to secure Crimea's energy independence, it was necessary that [the Russian side] observed the contract terms."

    Source : Sputnik
  15. forum rang 10 voda 9 augustus 2017 19:29
    DONG Energy divests 50pct of Borkum Riffgrund 2

    OE Digital reported that DONG Energy has agreed to sell 50% of Borkum Riffgrund 2, a 450 MW German offshore wind farm project, to Global Infrastructure Partners in a deal worth nearly USD 1.4 billion. Borkum Riffgrund 2 is currently under construction and is expected to be fully commissioned in 2019. The total sales price, consisting of the purchase price for GIP for its acquisition of 50% of the project and its commitment to fund 50% of the payments under a full-scope engineering, procurement and construction agreement with DONG Energy, amounts to USD 1.37 billion. The price is payable over a period from 2017 until 2019. GIP is also the 50% partner in another of DONG Energy’s offshore wind farms in Germany, Gode Wind 1.

    The transaction is subject to approval by the competition authorities and is expected to be completed before the end of 2017.

    Mr Samuel Leupold, executive VP and CEO of Wind Power at DONG Energy, said that “We’re pleased to be able to build on the partnership we established with GIP in relation to Gode Wind 1 in 2015. That partnership has been a success for all parties, and we’re committed to ensuring a similar success in relation to Borkum Riffgrund 2.”

    DONG Energy will construct the wind farm under a full-scope EPC agreement. DONG Energy will also provide long-term operations and maintenance services from its O&M base in Norddeich and provide a route to market for the power production from GIP’s 50% share of Borkum Riffgrund 2.

    Having entered into the agreement with GIP to divest 50% of Borkum Riffgrund 2, DONG Energy increases its EBITDA guidance for 2017.

    Source : OE Digital
  16. forum rang 10 voda 9 augustus 2017 19:32
    World record bid for YEKA tender expected to lower electricity generation costs in Turkey

    Daily Sabah reported that last week's tender for the Wind Energy Renewable Energy Resource Area project highlights many important aspects of Turkey's domestic and renewable energy strategy. As the tender resulted in a world record feed-in-tariff, a policy mechanism designed to accelerate investment in renewable energy technologies, at USD 3.48 per kilowatt-hour in Turkey offered by Siemens-Türkerler-Kalyon consortium, Energy and Natural Resources Minister Berat Albayrak announced, "Our current Feed-in-Tariff went down from 10.3 cents per kWh to 3.48 cents per kWh, making a new world record," on his official Twitter account. This price is calculated to be 40 percent below the Turkish spot market and 50 percent below the current incentive price.

    After a comparison with global data, it was revealed that the tender set a new record in affordable electricity generation when compared to South Africa, Brazil and Mexico, which use a similar model in renewable energy, as the domestic model stipulates a stronger tender specification and requires less public finance.

    The YEKA model is considered unique in renewable energy, with no other models set up to ensure a domestication rate higher than 65 percent and to provide for research and development (R&D) from the winning firms. The Dutch auction model requires a certain rate of domestication and is based on a long-term purchasing guarantee has been applied in South Africa, Mexico and Brazil. In the competitions held in these three countries, the long-term guarantee provided by the state was 20 years. Following the contract signing in Turkey, the YEKA model gave a 15-year purchasing guarantee, which includes the foundation of the factory and the production of wind turbines. In other words, the quicker the production, the better use of the purchasing guarantee for the contractors.

    With regard to the domestication rate, Turkey's wind power tender has the highest rate in the world. While Brazil requires a local production ratio of 12 out of 24 for equipment, South Africa asks for a 74 percent domestication rate and Mexico lays out the local production of wings and towers as a condition. Last week's tender held in Turkey stipulated a 65 percent domestic production rate, including technological parts and other components.

    Moreover, feed-in-tariffs -which offer long-term contracts to renewable energy producers based on the production cost of each technology- in South Africa, Brazil and Mexico were recorded at $4.71, $4.05 and $3.84, respectively. The 1 gigawatt wind tender in Spain, which has significant production facilities and brands in renewable technology throughout Europe, secured 4.3 euros ($5.06) for a feed-in-tariff. Therefore, the $3.48 feed-in-tariff in Turkey came in as a world record and reinforced trust in the country's domestic and renewable energy sector as well as in its economy.

    Source : Daily Sabah
  17. forum rang 10 voda 9 augustus 2017 19:33
    Wood Group supports Fosen Vind project with power performance testing

    Wood Group’s clean energy business, previously known as SgurrEnergy, has been chosen to carry out power performance testing on Europe’s largest onshore wind power project. The 1,000 MW Fosen Vind project, which is located in central Norway on the peninsula of Fosen, the island of Hitra and in Snillfjord, comprises six onshore wind farms and will have the combined capacity to power up to 170,000 Norwegian households when complete. The project will see Wood Group’s clean energy team undertake the installation of 29 guyed lattice met masts, data monitoring and analysis for the site calibration phase. This will be followed by the installation of power monitoring equipment fitted to a number of the wind turbine generators for the power curve test phase.

    Source : Strategic Research Institute
  18. forum rang 10 voda 19 augustus 2017 17:12
    Van Oord bouwt Duits windpark

    Gepubliceerd op 19 aug 2017 om 11:06 | Views: 749 | Onderwerpen: Duitsland

    ROTTERDAM (AFN) - Maritiem aannemer Van Oord heeft opdracht gekregen voor de aanleg van een windmolenpark in de Duits Bocht, 95 kilometer ten noordwesten van het Duitse Waddeneiland Borkum. Financiële details heeft het bedrijf zaterdag niet verstrekt.

    De werkzaamheden van Van Oord bestaan uit het ontwerp, de engineering, inkoop, bouw en installatie van de funderingen, de verbindingskabels en het offshore-hoogspanningsstation. Ook het transport van de windturbines wordt door de onderneming verzorgd.

    Het windmolenpark bestaat uit 31 windturbines en kan na voltooiing zo’n 178.000 huishoudens van groene stroom voorzien.

    De planning is dat de werkzaamheden in de tweede helft van 2018 beginnen. Eind 2019 moet het windpark operationeel zijn.
  19. forum rang 10 voda 22 augustus 2017 21:48
    Germany awards licences to increase onshore wind capacity by 1 GW

    Reuters reported that Germany will increase its onshore wind energy capacity by more than 1 gigawatt, equal to that of a nuclear plant, under new licences awarded. The regulator introduced an auction system this year to award licences, aiming to intensify competition among project developers in order to lower costs and wean renewable energy away from subsidies. In the second auction under the new system, the Bundesnetzagentur (BnetzA) said it accepted 67 applications, mostly from citizens' cooperatives, for a combined volume of 1,013 megawatt. Overall, 281 bids with a joint capacity of 2,927 MW had been submitted.

    BnetzA's President Mr Jochen Homann said in a statement that "The second round of tenders, too, was characterised by high competition. Compared with the first round, the average price at which projects were awarded fell by more than 1 euro cent per kilowatt hour."

    The projects, most of which are located in eastern Germany, were approved at an average price requiring a subsidy of 4.28 euro cents per kilowatt hour (kWh), down from 5.71 euro cents/kWh in the first round in May.

    Rather than guaranteeing a fixed price for 20 years, as was the case in the past, only those operators that can generate electricity from wind at the lowest subsidy are given a construction licence within a fixed capacity.

    Citizens' co-operatives, which are favoured in the new auction system over big commercial players in order to make development more acceptable within local communities, accounted for 90 percent of the successful bids.

    Source : Reuters
2.053 Posts
Pagina: «« 1 ... 24 25 26 27 28 ... 103 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Indices

AEX 860,01 -0,62%
EUR/USD 1,0655 +0,11%
FTSE 100 7.895,85 +0,24%
Germany40^ 17.714,20 -0,69%
Gold spot 2.392,50 0,00%
NY-Nasdaq Composite 15.282,01 -2,05%

Stijgers

WDP
+3,12%
Kendrion
+2,92%
EBUSCO...
+2,67%
Vopak
+2,61%
NX FIL...
+2,17%

Dalers

JUST E...
-5,11%
TomTom
-4,68%
Fugro
-4,30%
ASMI
-4,00%
BESI
-3,64%

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links