  6. Strategic Highlights

    Construction and commissioning of the new vanadium spent catalyst recycling facility in Zanesville, Ohio is proceeding as planned. The roaster is fully operational, and the entire plant is expected to be at run-rate capacity by the end of the fourth quarter of 2022.
    The project to expand the spodumene production in AMG Brazil is on time and on budget. The objective is to be in full production in the second half of 2023 or earlier.
    AMG Lithium has started construction of the first European lithium refinery, and commissioning for the first module of the battery-grade lithium hydroxide upgrader will commence in the second half of 2023.
    AMG’s first lithium vanadium battery (“LIVA”) for industrial power management applications is proceeding as planned and the objective is to be fully operational in the fourth quarter of 2022.
    Shell & AMG Recycling B.V. (“SARBV”) and its partner, the United Company for Industry (“UCI”), have signed an agreement with Saudi Arabian Oil Company (“Aramco”). Basic engineering has begun on the first of four projects to build, own and operate a conversion plant of vanadium-containing gasification ash supplied by Aramco into vanadium oxide and vanadium electrolyte.

    Ziet er allemaal prima uit. Duidelijk is dat vanaf volgend jaar inkomsten en groei in een stroomversnelling kunnen raken. Nu veel kosten door allerlei investeringen maar die ga je vanaf volgend jaar terug zien in de inkomsten stroom.
  7. Reactie
  8. Reactie
  9. Reactie
  10. Reactie
  11. Reactie
  12. Reactie
  13. Reactie
  14. Reactie
  15. quote:

    tmaster schreef op 28 juli 2022 13:21:

    Strategic Highlights

    Construction and commissioning of the new vanadium spent catalyst recycling facility in Zanesville, Ohio is proceeding as planned. The roaster is fully operational, and the entire plant is expected to be at run-rate capacity by the end of the fourth quarter of 2022.
    The project to expand the spodumene production in AMG Brazil is on time and on budget. The objective is to be in full production in the second half of 2023 or earlier.
    AMG Lithium has started construction of the first European lithium refinery, and commissioning for the first module of the battery-grade lithium hydroxide upgrader will commence in the second half of 2023.
    AMG’s first lithium vanadium battery (“LIVA”) for industrial power management applications is proceeding as planned and the objective is to be fully operational in the fourth quarter of 2022.
    Shell & AMG Recycling B.V. (“SARBV”) and its partner, the United Company for Industry (“UCI”), have signed an agreement with Saudi Arabian Oil Company (“Aramco”). Basic engineering has begun on the first of four projects to build, own and operate a conversion plant of vanadium-containing gasification ash supplied by Aramco into vanadium oxide and vanadium electrolyte.

    Ziet er allemaal prima uit. Duidelijk is dat vanaf volgend jaar inkomsten en groei in een stroomversnelling kunnen raken. Nu veel kosten door allerlei investeringen maar die ga je vanaf volgend jaar terug zien in de inkomsten stroom.
    Op 4-5:
    AMG Brazil will increase its spodumene production by 40,000 tons, bringing its production capacity to 130,000 tons per annum. The project is proceeding as planned, construction will begin in the third quarter of 2022; and commissioning will commence in the second quarter of 2023.

    Dus verschoven richting 2e helft van 2023. Alleen staat er steeds bij dat alles volgens plan gaat.
  16. Reactie
  17. Reactie
  18. Reactie
  19. Reactie
  20. Reactie
  21. quote:

    r66 schreef op 28 juli 2022 13:28:

    [...]

    Op 4-5:
    AMG Brazil will increase its spodumene production by 40,000 tons, bringing its production capacity to 130,000 tons per annum. The project is proceeding as planned, construction will begin in the third quarter of 2022; and commissioning will commence in the second quarter of 2023.

    Dus verschoven richting 2e helft van 2023. Alleen staat er steeds bij dat alles volgens plan gaat.
    Ik denk dat commisioning nog iets anders is als in volle productie gaan.
  22. Reactie Laatste reactie

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Forumregels | Lees hier het forumreglement

Kwaliteit boven kwantiteit

Lever een duidelijke en constructieve bijdrage aan de discussie. Kwaliteit trekt kwaliteit aan.

Blijf ontopic

beperk je reactie tot het onderwerp van het forumdraadje en haal er geen andere zaken bij.

Respecteer je medemens

Een afwijkende visie op een bedrijf rechtvaardigt geen persoonlijke aanvallen. Reageer op de inhoud van iemands argumenten, niet op de persoon;